Sh Construction Of Unlined Surface Drain, Kharanja Stone Soling Between Km 8/00 To 9/00 And Cutting Of Shrubs Km 0/00 To 13/960 R/R Damages On Kharapather Tahu Devrighat Road Km 0/00 To 13/960
Sh Cd Works At Rd 0/315 And P/L Kharanja Stone Soling At Rd 0/00 To 0/150 And R/Wall At Rd 0/130 To 0/160 C/O Link Road From Malkhar Kanchi To Mundal Km 0/00 To 1/500
R.R.Damages On Kun To Padhar Road Km. 0/0 To 1/500. Sh - P/L Kharanja Stone Soling 80 Mm Interlocking Paver Block M/T And Drain In Km 0/00 To 1/500 Under Pdna 2023
P/l Stone Soling And C.c. Pavement From Rd. 0/395 To 0/645. Under Pdna. Restoration Of Rain Damages On Link Road To Harizan Basti Miharpura Km. 0/00 To 3/00
Rrd On Gohar Neori Road Km 0/00 To 5/00 Sh C/o Pcc Edge Wall, U-shape Drain, Kharanja Stone Soling At Rd 0/600 To 0/700 Under Pdna
Sh P/L Kharanja Stone Soling At Rd 1/700 To 2/800 Portion Pansari To Ram Mandir Under Pdna R/R Damages To Malog To Pansari Road Km 0/00 To 4/00
Sh P/l Kharanja Stone Soling At Rd 1/800 To 2/900 Under Pdna R/r Damages To Sansog To Koftu Road Km 0/00 To 4/00
Rr Damages On Npb Road Km 0.000 To 22.000 Sh. Rofd C.o R.wall, P.l Kharanja Stone Soling And P.l Paver Blocks Between Km 4.600 To 4.825.
Sh C.o R.wall In With Pcc Toe Wall At Rd 4.840 To 4.860, 4.930 To 4.950 And Stone Soling At Rd 4.470 To 5.00 Under Pdna.
Construction Of Bus Stand At Bhabanagar. Sh- Demolition Of Concrete Wall, P.l Kharanja Stone Soling, Concrete Steps At Switch Yard, Cc U - Shape Drain G.f Level And Providing And Fixing Aluminum Fitting Booth At Bhabanagar -i.