Supply And Laying Sewer, Storm Water Lines And External Development Workcivil Around The Library And Computer It Building At Coep Technological University
Removing Debries / Silt From Existing Sewer Line / Storm Water Drianage Line With Cctv Camera And Super Sucker Machine At Different Roads Of In Bapunagar And Saraspur-rakhiyal Ward In North Zone
Repair To Leaky Roof Of Staff Qtrs At Sadar Bazar Bl. No 98, 99, 100, T-26, T-22.T-28. T-80, 82, 83, 84, 86, T-29, Motia Bagh Bl.No. 77, 78, T-197 And Repair To Damage Sewer Line, Storm Water Line Of Bl No T-80-98, 100 In Sadar Bazar & Motia Bagh Railway Colony In The Section Of Sse/W/Tis Hazari Under Aden/E-I.
Development Of Bsf Campus Old Jalalabad Of 124 Bn Bsf Now 158 Bn Under Shq Bsf Ferozepur Sub Head Internal Roads 0.2 Mld Sewerage Treatment Plant Sewer Lines Water Supply Storm Water Drains And Rain Water Harvesting
Cleaning Of Sewer And Storm Water Line By Bucket Type Sewer Machine In Ngm
Development Of Bsf Campus Khem Karan Of 14 Bn Now 148 Bn Bsf Under Shq Bsf Ferozepur Sh Sewer Lines Water Supply Storm Water Drains Rain Water Harvesting 2Nd Call
A/r And M/o To D.a. Flats Residential Building At Haiderpur Under Sub Division-iv/nw Building Division During 2025-26. Sh- Cleaning Of Storm Water Drains And Sewer Line.
Providing And Laying Sewerage, Storm Sewer And Rain Water Harvesting System In Kali Mata Mandir, Head Deposit Work.
Providing Water Supply, Sewerage And Storm Sewer Network, Main Pumping Station, Effluent Treatment Plant, Fire Fighting System And Rain Water Harvesting System In E-bus Charging Station Near Mathura Colony
Cleaning Of Sewer, Waste, Storm Water Lines /drains, Septic Tank Etc. At Various Premises Under The Jurisdiction Of Magathane And Dindoshi Bus Depot 2025 To 2028