Strengthening Of Existing Protection Works And Spurs Along River Ghagger In Panchkula Extn. And Providing Apron In Front Of Existing Spur No. 1, 5 Facing Multifeature Park, Sector-24, Spur No. 19 To 25 Facing Sector-26 To 28 And Damaged Apron Facing
Strengthening & Extension Work Of Storm Water Line Including Construction Of Machineholes As And When Required In Various Areas Of Sub Zone 3 At South West Athwa Zone.
Balance Work Of Bagora To Kalijhora Road Via Latpanchar From 0.00 Km To 19.00 Km Strengthening And Allied Work
Providing Strengthening With Dbm, Bc And Ccp Improvement By Providing Strengthening Of Gohana Baroda Julana Road Road Id-6152 In Sonepat Distt.
Dinhata Balarampur Chilakhana Rd, From 0.00 Km To 20.00 Km, Widening From Carriageway 5.50 M To 7.00 M And Strengthening Works Including Const Of 5 Cd Structures, 4580 M Protection Work, 3170 M Drainage Work
Strengthening Of Ncc Office In Ncc 13 Mah. Batalian At. Khamgaon Tq. Khamgaon
Strengthening Of Record Room In P. W. Division Khamgaon Tq. Khamgaon
Work of Widening, Strengthening and Resurfacing of various road as and when required or in emergency under Panchayat R&B Division, Junagadh (Annual Rate Basis) (3rd Attempt)
Repairing And Restoration Work Of Existing Bidada 9 Nine Mld Water Treatment Plant And Strengthening Of Gadhshisha To Bhadai Shw 350 Mm Di Line At Kharod River Near Sherdi Village And Other Sites Under M & R 2025-26 Mandvi Part - I Bidada Complex
Special Estimate For Strengthening The 132Kv Uklana By Provision Of 132Kv Bay Control Equipment At 132Kv S/C Uklana-Dablain Line Bay At 132 Kv Substation Uklana For The Year 2025-26