Bavla Swd -I Under Sjmmsvy : Working Survey, Soil Investigation, Design And Construction, Testing And Commissioning Of Providing, Supplying, Lowering, Laying And Jointing Rising And Gravity Main Pipeline Network And Box Drainage Network, Pumping Station, Compound Wall, Electro-Mechanical Work With Post Completion Of 02-Year Operation And Maintenance Including 03-Three Years Defect Liability Period For Bavla Nagarpalika Strom Water Drainage, Tal: - Bavla, Dist.: Ahmedabad, Gujarat Under Sjmmsvy
Laying Of New Drainage Line And Strom Water Line In Different Places In Lambha Wards In South Zone.
Laying Of New Drainage Line/Strom Water Drain Line, Upgradation Work On The New Roads To Build And Breakdown Repairing Work And Drainage Line/Strom Water Drain Line Related Works At Shahvadigam, Ranipurgam, Rangolinagar, Pipalj, Saijjpur-Gopalpur, Kamodgam.
Repairing Drainage Line, Strom Water Drain Breakdown Machin Hole And P/L Systematic Drainage Line At Old Shahibaug, Dudheshwar Area, Old Shahpur Area Under Muni Councilor Shree, Mp, Mla Shree Budget And Different Budget At Different Place In Shahpur Ward.
Annual Rate Contract For Cleaning Of Strom Water Drainage Line And Removing Weeds From Lake For Sanand Nagarpalika, Sanand
Construction Of Storm Water Drain At Barvala Nagarpalika Khamidana Darvaja Bahar Strom Water Drainage Work At Barvala
Construction Of Cement Concrete Road, Paver Block Road, Beautification, Strom Water Drainage, Footpath, Pipe Culvert, Compound Wall Renovation, Garden Renovation, Street Light With Pole And Asphalt Road Work At Various Locations Of Ranavav Nagarpalika Area, Ranavav
Working Survey, Soil Investigation, Designing And Constructing An Integrated Storm Drainage System Including Providing, Supplying, Lowering Laying, Jointing, Testing And Commissioning Gravity Mains From Kansa To Mahesana Junction. Including 03-three Years Defect Liability Period For Visnagar Nagarpalika Strom Water Drainage Project
Construction Of Strom Water Disposal Drainage At B Dharmathupatti Ward 11 From Mariyamman Kovil Street To Subash Chandra Bose Street General Fund 2025 2026 Melachokkanathapuram Town Panchayat Construction Of Strom Water Disposal Drainage At B Dharmathupatti Ward 11 From Mariyamman Kovil Street To Subash Chandra Bose Street In Melachokkanathapuram Town Panchayat
Construction Of Strom Water Disposal Drainage At B Dharumathupatti Wart 11 From Kaliyamman Kovil Street To Kakkan Strett General Fund 2025 2026 Melachokkanathapuram Town Panchayat Construction Of Strom Water Disposal Drainage At B Dharumathupatti Wart 11 From Kaliyamman Kovil Street To Kakkan Strett In Melachokkanathapuram Town Panchayat