Gnt Division - Provision Of Gantry Isolation Arrangement At Traction Sub-Stations And Switching Stations Over The Division
Replacement Of Damaged Traction Bonds At Various Station, Lc Gates, Bridges, Switching Sub-Stations Etc Over Malda Division Of Eastern Railway.
Outsourcing Of Psi Maintenance Activities At 25Kv Ac Traction Sub-Stations & Feeding Posts 04 Nos., Switching Stations Sp/Ssp 21 Nos. And Auxiliary Transformer 142 Nos. Of Kwae - Az, Bdc - Kwae, Bwn - Kwae And Kwae - Amp Section In Howrah Division Of Eastern Railway 24 Months.
Design, Supply, Erection, Testing & Commissioning Of Traction Sub Stations With Associated Switching Posts For 2x25 Kv At Traction Feeding System In Varanasi- Prayajgraj Section Of Varanasi Division Of North Eastern Railway For Capacity Up- Gradation Work Of Electric Traction Power Supply Installations On Engineering, Procurement & Construction Epc Mode.
Sc Division-Provision Of Gantry Isolation Arrangement At Traction Sub-Station And Switching Stations Over Sc Division
Design, Supply, Erection, Testing & Commissioning Of Traction Sub Stations With Associated Switching Posts And Provision Of Supervisory Control And Data Acquisition Scada System For 2 X 25 Kv At Feeding System In New Delhi- Faridabad Fdb Section Of Delhi Division Of Northern Railway For Raising Of Speed To 160 Kmph
Guntakal Division - Provision Of Gantry Isolation Arrangement At Traction Sub- Station And Switching Stations Over The Division.
Gnt Division - Provision Of Gantry Isolation Arrangement At Traction Sub-stations And Switching Stations Over The Division
Provision Of Switching Stations At Mldt, Slj, Bgp & Jmp For Segregation Of Yard/Sidings From Main Line Including Provision Of Ohe At Washing Pit Line At Sbg & Goods Siding At Ppt Over Malda Division Of Eastern Railway.
Procurement Of Lightening Arrestor. 42 Kv, 10 Ka, Metal Oxide Gapless Type Lightning Arrestor For Use On Railway Traction S Ubstations And Switching Stations As Per Rdso Spec. No.Ti/Spc/ Psi/Mogtla/ 0101 02/15 Warrant Y Period: 30 Months After The Date Of Delivery Quantity Tolerance +/-: 5 %Age, Item Category : Normal, Total Po Value Variation Permitt Ed: Max 8 Lacs