Supply And Application Of Spray Thermal Insulation On Hp-ip Turbine Casing And Its Associated Control Valves, Mssv, Esv, Iv, Valves Chests Etc. For 210 Mw Turbine Unit No.5 At Ukai Tps On As And When Required Basis And During Aoh For Year 2025-26. Wt-5038 Tmd-ii.
Thermal Spray Insulation Of Ip Turbine Casing And Governing Valves Of 4x210 Mw Kwu Designs Tg Units At Ggsstp, Rupnagar
Work Of Removal And Supply And Reapplication Of Spray Thermal Insulation During Coh Of Unit No.7 Stage-iii At Wtps.
Thermal Spray Insulation Of Ip Turbine Casing And Governing Valves Of 4x210 Mw Kwu Designs Tg Units At Ggsstp, Rupnagar
Thermal Spray Insulation Of Ip Turbine Casing And Governing Valves Of 4x210 Mw Kwu Designs Tg Units
Work Of Supply And Application Of Spray Thermal Insulation For Turbines & Turbine Related Various Piping And Valves Of 250 Mw Units 3 & 4 Of Stps On As & When Required Basis.
Thermal And Spray Insulation Works Pertaining To Boiler And Turbine Area Of 250 Mw, Unit-7, Ptps, Panipat During Its Overhauling Mp-7079
Supply of 2 Thermal Insulation Spray Type Hnk 632.8-3 Application Of Thermal Insulation Spray Type
Work Of Removal And Supply And Reapplication Of Spray Thermal Insulation During Coh Of Unit No.7 Stage-Iii At Wtps.
Supply & Application Of Spray Thermal Insulation On Hp & Ip Turbine Casing & Its Associated Control Valves, M.S.S.V, E.S.V., I.V., Valves Chests, Deaerator Etc. 200 210 Mw Turbine Unit Nos.3, 4 & 5 At Ukai Tps On As & When Required Basis & During A.O.H. Wt-4686 Tmd-Ii