"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders for tool post

Total 72 tenders found
#TBR: 35296341 Closed

Railway Transport

  • West Bengal
  • Due On: 15 Sep, 2025 (0 Days Left)

Supply Of Channel Frame For Tool Post Assembly.

Ref. Document
View Tender
#TBR: 35272126 Closed

Security Services

  • Uttar Pradesh
  • Due On: 15 Sep, 2025 (0 Days Left)

Gem Bids For Cnc Turret Chuck/tool Post Mounted Car Bon Steelboring Tool Holder For Slotted Tool Disc. Bore D

Ref. Document
View Tender
#TBR: 35209577 Closed

Railway Transport

  • Uttar Pradesh
  • Due On: 25 Aug, 2025 (0 Days Left)

Supply Of Square Turret & Rear Tool Post Part No-3061 To Suit Preoptive Turret Lathe Machine Mk-7, Make Kirloskar..

Ref. Document
View Tender
#TBR: 35116837 Closed

Security Services

  • Rajasthan
  • Due On: 23 Aug, 2025 (0 Days Left)

Gem Bids For Cpv, 8 Port Swtich For Command Post, Dvr 4 Port For Commandpost, Rj 45 Tool For Command Post, Vga To Bnc Connector, Cat 6 Cable, Radio Cable, Lan Cable, Power Cable, Drumfor Cable

Ref. Document
View Tender
#TBR: 34793301 Closed

Security Services

  • Rajasthan
  • Due On: 19 Jul, 2025 (0 Days Left)

Gem Bids For Cpv, 8 Port Switch For Command Post, Dvr 4 Port For Commandpost, Rj 45 Tool For Command Post, Vga To Bnc Connector, Cat 6 Cable, Radio Cable 3 Mtr, Lan Cable 5 Mtr, Powercable 91 Mtr, Drum For Cable

Ref. Document
View Tender
#TBR: 34615298 Closed

Railway Transport

  • Maharashtra
  • Due On: 13 Jun, 2025 (0 Days Left)

Supply Of Complete Tr Probe Tool Post Assembly For Railscan-120.

Ref. Document
View Tender
#TBR: 34535608 Closed

Security Services

  • West Bengal
  • Due On: 10 Jun, 2025 (0 Days Left)

Gem Bids For 24 Tool Post Tool Holder Block B1 For Jyoti 250dx Cnc Mc Tool Post Tool Holder Block B3 For Jyoti 250dx Cnc Mc

Ref. Document
View Tender
#TBR: 34096409 Closed

Scientific Research/instruments

  • Maharashtra
  • Due On: 21 Mar, 2025 (0 Days Left)

Supply of 1 Dft And Semi-Empirical Force-Field Preprocessing Post- Processing And Simulation Tool For Nano-Devic

Ref. Document
View Tender
#TBR: 33990244 Closed

Scientific Research/instruments

  • Telangana
  • Due On: 24 Feb, 2025 (0 Days Left)

Tecplot 360 Chorus And Fieldview Cfd Post Processing Tool For Data Analysis

Ref. Document
View Tender
#TBR: 33979410 Closed

Railway Transport

  • Uttar Pradesh
  • Due On: 24 Feb, 2025 (0 Days Left)

Supply of Spring For Tool Post 1 Set 2 Nos, Make-Modsonic Warranty Period: 30 Months After T He Date Of Delivery Drt Wheel Collar, Make-Modsonic Warranty Period: 30 Months After The Date Of Deliver Y Silicon Tube Small Per Mtr, Make- Modsonic. Warranty Period: 30 Months After The Dat E Of Delivery Silicon Tube Big Per Mtr, Make- Modsonic. Warranty Period: 30 Months After The Date Of Delivery Complete Angle Probe Tool Post Assembly, Make- Modsonic. Warranty Period: 30 Mont Hs After The Date Of Delivery Complete Tr Probe Tool Post Assembly, Make- Modsonic. Warranty Period: 30 Months A Fter The Date Of Delivery Drt Cable Set Length: 2.4 Mtr.- 1 Set 8 Nos. For Railscan-220, Make- Modsonic. Warr Anty Period: 30 Months After The Date Of Delivery Drt Wheel Bearing, Make- Modsonic. Warranty Period: 30 Months After The Date Of Deli Very Probe Roller With Clamp Attachment, Make- Modsonic. Warranty Period: 30 Months Afte R The Date Of Delivery Guide Roller With Bearing & Stud, Make- Modsonic. Warranty Period: 30 Months After Th E Date Of Delivery 0 Degree Normal Probe 4 Mhz. Double Crystal - Tr 18/20 Mm Dia With Integrad Cable Railsc An-220, Make- Modsonic. Warranty Period: 30 Months After The Date Of Delivery Bw70n2-Pr Angle 70 Deg Backward/Forward Special Probe, Make- Modsonic. Warranty Period: 30 Months After The Date Of Delivery Bw45n2-Angle Probe 45 Deg. 20X20mm Side Entry, Make- Modsonic. Warranty Period : 30 Months After The Date Of Delivery Atbb -1-14.4 Volts/4Ah Li-Lon Rechargeable Battery Pack, Make- Modsonic. Warranty Pe Riod: 30 Months After The Date Of Delivery Encoder With Gps Cable Assembly, Make- Modsonic. Warranty Period: 30 Months After T He Date Of Delivery Drt Wheel Assembly, Make- Modsonic. Warranty Period: 30 Months After The Date Of D Elivery Drt Wheel Drum, Make- Modsonic. Warranty Period: 30 Months After The Date Of Delive Ry Guide Roller Shaft Assembly, Make- Modsonic. Warranty Period: 30 Months After The Da Te Of Delivery Bearing Roller Bush Bearing-Big, Make- Modsonic. Warranty Period: 30 Months After T He Date Of Delivery Pkbb -2 : Probe Cable Bnc To Bnc 2 Mtr Long, Make- Modsonic. Warranty Period: 30 M Onths After The Date Of Delivery Bw37n2-Pr Angle Probe 37 Deg Backward/Forward - Special Probe, Make- Modsonic. War Ranty Period: 30 Months After The Date Of Delivery Normal Probe Single Crystal 2.0/2.5 Mhz 20Mm Diameter Crystal, Make- Modsonic. Warr Anty Period: 30 Months After The Date Of Delivery Atc-1 : Battery Charger Cum Mains Power Pack With Charge Status Lndicator & Power Cord, Make- Modsonic. Warranty Period: 30 Months After The Date Of Delivery Water Control Valve Assembly -9 Channel One Side, Make- Modsonic. Warranty Period: 30 Months After The Date Of Delivery Encoder Gear Both End 1Set 2 Nos., Make- Modsonic. Warranty Period: 30 Months After The Date Of Delivery Tr Probe Base, Make- Modsonic. Warranty Period: 30 Months After The Date Of Delivery

Ref. Document
View Tender
Download Document