Gem Bids For Custom Bid For Services - Inspection Maintenance Replacement Of Eot Crane Gantry Track & Trolley Rails In Bof & Ccp Area
Supply Of Welders And At Welding Portions For Removal & Welding Of Defective Rails Joints From Track Under Sse/p.way/madgaon Section.
Supply Of Welders And At Welding Portions For Removal & Welding Of Defective Rails Joints From Track Under Sse/P.Way/Karwar Section
Replacement Of Wornout Rails From Laybay Track And Recondition The Existing Wornout Points And Crossings Of Railway Siding At Tnpl Unit I
Replacement Of Worn Out Rails From Laybay Track And Recondition The Existing Wornout Points And Crossings Of Railway Siding At Tnpl Unit I
Clearing The Slided And Spilled Coal Along The Walkways Over Below Deck Sheets, Between The Track Rails And Outside The Track Rails Both North South Sides Of Stacker-i And Reclaimer-i Machines Travel Path In Conveyor-49
Clearing The Slided And Spilled Coal Along The Walkways Over Below Deck Sheets, Between The Track Rails And Outside The Track Rails Both North South Sides Of Stacker-ii And Reclaimer-ii Machine Travel Path In Conveyor-54.
Supply of High Availability Single Section Digital Axle Countershassdac With Dual Sensor System As Per Rdso Spec. No:Rdso/Spn/177/2012 Ver.3 With Dual Track Sensor Device Or Latest Amended Up To Date Of Tender Opening. This Includes The Supply Of High Frequency Web Mounting Type Tx Coil/Rx Coil- 04 Nos., Vr/Prbox Duly Wired-02 Nos., Vital Relays-04 Nos., Pr Relays- 04 Nos., Clamp With Deflector Plates & Hardware- 08 Nos., Dual Display Reset Box With Auto Resetting Facility- 02 Nos., Surge Voltage Protection D Evices And Filter Card To Be Mounted On Din Rail Etc- 02 Nos. For Complete Installation & Testing & Commissio Ning Of Hassdac System. Note: One Set Of Hassdac System Will Include Equipment Required To Monitor One Up Line Or One Dn Line Of A Full Block Section Between Two Stations. 2 Installation, Testing & Commissi Oning Of High Availability Single Section Digital Axle Counter Hassdac, Single Section Type System Complet E With Track Devices And Other Associated Accessories To Be Ensured By Oem. This Include Fixing Of Device, R Elays, Wiring, Lacing/Dressing, Cable Termination With Lug Eyelet, Drilling Holes In Rails, Installation Of Track D Evices And Make It Functional Along With Existing Ufsbi/Block Instrument. Material Required Other Than Supp Ly Item Of Hassdac In Item No. 1 Above Shall Be Arranged By Firm To Make It Functional. Warranty Perio D: 30 Months After The Date Of Delivery 1Supply Of High Availability Single Section Digital Axle Countershassdac With Dual Sensor System As Per Rdso Spec. No:Rdso/Spn/177/2012 Ver.3 With Dual Track Sensor Device Or Latest Amended Up To Date Of Tender Opening. This Includes The Supply Of High Frequency Web Mounting Type Tx Coil/Rx Coil- 04 Nos., Vr/Prbox Duly Wired-02 Nos., Vital Relays-04 Nos., Pr Relays- 04 Nos., Clamp With Deflector Plates & Hardware- 08 Nos., Dual Display Reset Box With Auto Resetting Facility- 02 Nos., Surge Voltage Protection D Evices And Filter Card To Be Mounted On Din Rail Etc- 02 Nos. For Complete Installation & Testing & Commissio Ning Of Hassdac System. Note: One Set Of Hassdac System Will Include Equipment Required To Monitor One Up Line Or One Dn Line Of A Full Block Section Between Two Stations. 2 Installation, Testing & Commissi Oning Of High Availability Single Section Digital Axle Counter Hassdac, Single Section Type System Complet E With Track Devices And Other Associated Accessories To Be Ensured By Oem. This Include Fixing Of Device, R Elays, Wiring, Lacing/Dressing, Cable Termination With Lug Eyelet, Drilling Holes In Rails, Installation Of Track D Evices And Make It Functional Along With Existing Ufsbi/Block Instrument. Material Required Other Than Supp Ly Item Of Hassdac In Item No. 1 Above Shall Be Arranged By Firm To Make It Functional. Warranty Perio D: 30 Months After The Date Of Delivery
Attending Routine Maintenance Of Track Rails Of Conveyor49 54 Track Path By Clearing The Sticked Coal.
Ichp -Clearing The Slided And Spilled Coal Along The Walkways Over Below Deck Sheets, Between The Track Rails And Outside The Track Rails Both North, South Sides Of Stacker-I And Reclaimer-I Machines Travel Path In Conveyor-49