Outsourcing Of Psi Maintenance Activities Of 25 Kv Ac Traction System Over Gzb-sre For A Period Of Two Years.
Design, Supply, Erection, Testing & Commissioning Of 220/132/55 Kv Traction Substation, Sectioning Post (sps), Sub Sectioning Post (ssps) In 2 X 25 Kv Ac Traction System (scott Connected Transformer) Of Nagpur-wardha-badnera Section
Supply, Installation, Testing, And Commissioning Of Automatic Fault Locator (afl) For 2x25 Kv Ac Traction System Of Latest Rdso Specification In Ghd-seb Section Of Dhanbad Division
Supply, Erection, Testing And Commissioning Of 132kv/55 Kv Scott Connected Traction Sub Station And Switching Posts With At Between Feeding Itarsi (excl.) - Shridham (incl.) Section (without Scada) Of Jabalpur Division, W C Railway In Connection With Up-gradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System Of Wcr To Meet 3000 Mt Loading Target.
Design, Drawings, Earthwork, Fencing Foundation, Site Readiness, Equipment Foundations, Control Building, Battery Room, Cable Trenches, Etc., Including General Services Works & All Miscellaneous Works For 132/55 Kv Traction Substation, Sectioning Post (sps), Sub Sectioning Post (ssps) In 2 X 25 Kv Traction System (scott Connected Transformer) Of Bhusaval- Burhanpur Sections Of Central Railway, To Meet 3000 Mt Loading Target
Design, Drawings, Earthwork, Fencing Foundation, Site Readiness, Equipment Foundations, Control Building, Battery Room, Cable Trenches, Etc., Including General Services Works & All Miscellaneous Works For 132/55 Kv Traction Substation, Sectioning Post (sps), Sub Sectioning Post (ssps) In 2 X 25 Kv Traction System (scott Connected Transformer) Of Burhanpur-khandwa Sections
Work For Up-gradation Of Existing 1x25kv Electric Traction System To 2x25 Kv At Feeding System In Pox-amf Section In Nagpur Division Of Centrai Railway To Meet 3000 Mt Loading Target Of Central Railway To Meet 3000 Mt Loading Target.
Design, Supply, Erection, Testing & Commissioning Of Railway Electrification Work Of 2x25 Kv Ac Ohe Traction System Along With Boundary Sectioning Posts Bsps, Sub- Sectioning Posts Ssps Between Sahjanwa Excl. To Bansgaon Incl. Section In Connection With Sahjanwa - Dohrighat New Bg Line Project In N.e. Railway Of Lucknow Division
Supply of Set Of Items For Traction Motor Dropping Detection System In Three Phase Locomotives As Per Drawing No. Angp/Trs/4/25.254 Qty 04 Nos. B Ngp/Trs/4/25.252 Qty 06 Nos. C Ngp/Trs/4/25.253 Qty 06 Nos. D Ngp/Trs/4/25.251 Qty 06+02+04 12 Nos. One Set Consists Of 04 Items In 28 Nos..
Supply Of L Type Angle And Clamp Includi Supply Of L Type Angle And Clamp Including Rectangular Flat For Traction Motor Dropping Detection System For Wap-7 Locos As Per Els Gmo Drawing Number - Trs/gmo/tm/3ph/045 Including Ss Hardware Items. I Hex Head M12 X 30 - 18 Nos. Ii M12 Plain Washer - 18 Nos. Iii M12 Spring Washer - 18 Nos. Make - Tvs, Unbrako, Apl Or Similar.