Construction Of Boundary Wall Between Electricity Training Center And Subdivision Office, Special Maintenance And Repair Of Old Hostel Block And Other Civil Works At Uttarakhand Power Traininig Institute Campus, Bahadarabad Haridwar .
Gem Bids For Training, Rebound Net, Lacrosse Sticks, Practise Ball Gold, Elitekookaburra Ball, Ankle, Resistance Band Yellow 25 Kg, Resistance Band Orange 35 Kg, Resistance Band Red 45 Kg, Training Cone 9Inch, Training Cone 12Inch, Wall Ball 8 Kg, Wall Ball10 Kg, Swiss Ball 65 Cm, Swiss Ball 85 Cm, Swissball 95 Cm, Fox 40 Whistle Finger, Ball Carriage Trolly, Ballbag, Jump Box 12Inch, Jump Box 18Inch, Jump Box 24Inch, Gym Rope 15 Mtr, Hand Gripper, Yoga Matt 6Mm, Foamroller Small, Foam Roller Big, Dummy Defender With Base, Goal Post Net, Target Net, Skipping Rope, Pc Defenderabdominal Guard, Elite Glove, Pro Knee Guard, Face Masksteel, Training Bibs, White Board With Stand, Stop Watch, Tennis Racket, Tennis Ball Pack Of 3, Dumbbell 17.5 Kg, Dumbbell 20 Kg, Dumbbell 22.5 Kg, Dumbbell 25 Kg
Gem Bids For Rebound Net, Lacrosse Sticks, Practise Ball Gold, Elitekookaburra Ball, Ankle, Resistance Band Yellow 25 Kg, Resistance Band Orange 35 Kg, Resistance Band Red 45 Kg, Training Cone 9inch, Training Cone 12inch, Wall Ball 8 Kg, Wall Ball10 Kg, Swiss Ball 65 Cm, Swiss Ball 85 Cm, Swissball 95 Cm, Fox 40 Whistle Finger, Ball Carriage Trolly, Ballbag, Jump Box 12inch, Jump Box 18inch, Jump Box 24inch, Weight 15kg Rubber Coated, Weight 10kg Rubber Coated, Weight 20 Kg Rubber Coated, Gym Rope 15 Mtr, Handgripper, Yoga Matt 6mm, Foam Roller Small, Foam Rollerbig, Dummy Defender With Base, Goal Post Net, Targetnet, Skipping Rope, Pc Defender Abdominal Guard, Eliteglove, Pro Knee Guard, Face Mask Steel, Training Bibs, White Board With Stand, Stop Watch, Tennis Racket, Tennis Ball Pack Of 3, Dumbbell 17.5 Kg, Dumbbell 20 Kg, Dumbbell 22.5 Kg, Dumbbell 25 Kg
Gem Bids For Wall Steel Board For Training
Dredging Works, Construction Of River Training Walls And Groynes. Clearing Of Water Way And Construction Of River Training Wall With Associated Structures In Bahada Nalla Near Haripur
Gem Bids For Lime, Lime Quick Maint Of Trg Area, Cement Paint Ivory Fortraining Area, Sand Paper For Training, Paint Red Oxide Forpainting Of Trg Area, Oil Paint For Training Area, Turpentineoil For, Wall Putty For, Paint Black For, Paint Golden, Paintwhite For Trade Work Training, Modular Switch Board Withplate, 6 Modular Switch Board, 8 Modular Switch Board, Ceiling Fan Seventy, Ceiling Fan Rod, Ceiling Rose Fortraining, Celling Fan For Welfare, Earthing Pit Cover Withmesh, Fan Regular Switch Type, Flexible Pipe 1 Inch, Flexible Wire For Wiring, Gi Eartthing For Training, Gi Pipe Forconstruction, Insulation Tape, Tube Light Twenty Watt, Mcb 16 Amp Dp, Mcb Twenty Amp Dp, Mcb 32 Amp Dp, Mcb 6 Amp Dp, Mcb Box Iron Ten Way, Modular 5 Amp Ptswitch, Modular For Electric, Modular Dummy Switch, Poblique T Switch, Pvc Bend 1 Inch, Pvc Casing Capping 1Inch Into 6 Feet, Pvc Conduit Pipe 1 Feet Into Ten Feet Long, Pvc Junction Bax 1 Inch Into 1 Way, Pvc Junction Bax 1 Inchinto 2 Way, Pvc Junction Bax 1 Inch Into 3 Way, Pvcsquare Box, Pvc Wall Plug 25 Into 8Mm, Pvc Wire 1 Sqmmm Oblique, Pvc Wire 1 Sqmm, Pvc Wire 1 Sqmm M S, Pvcwire 1 Red Colour, Pvc Wire Balck Colour, Pvc Wire 2Balck Colour, Pvc Wire Red Colour, Screw 25 Into 8Mm, Screw 35 Into 8Mm, Socket 5 Amp, Switch Socketcombination With Box /Bid Number: Gem/2025/B/6808613* /Dated: 19-10-2025 & & / Bid Document1 / 43
Renovation Works In The Surrounding Area Of The Newly Constructed Security-cum-training Complex Compound Wall, Drainage And Walkway
Beautification Including Construction Of Boundary Wall Of Inspection Hut Located At Chakkarpur Dam Site, Safety Gate On Dam And Inspection Hut, Construction Of Concrete Stairs With Railing On Both Sides From Earthen Dam To Training Wall At Top Of Cha
Constructing D/S Right Side Extension Of Training Wall For Stilling Basin At Karjan Dam.
Gem Bids For Training, Wall Bar, Leg Curling, Pushup Bar, Dumble Weight Bar, Chinup Bar