Supply Of Corrugated Flexible Pvc Drainage Pipe, Thickness- 2mm Having Transition Fit To Item No. 1 Dia-27mm To Drawing No. C/skmisc-070 In Roll Length Of 30 Meters Commercial Quality..
Dismantling And Shifting Of Screw Conveyor Inside The Mill, Re Erection Including Tie Rods, Screw Conveyor Bearing Housing And Stuffing Box, Replacement Of Eroded Feed Pipe, Mixing Box And Transition Piece With New Spares, Replacement Of Screw Conveyor Removable Shaft Of Unit 5 & 6 Mills During The Annual Overhaul Period 2025-26
Supply Of Transition Chute For Feed Pipe Of Xrp-943 Bowl Mills Of Unit 3 And 4/stage-ii/btps
Mtps I Mill Plant Unit Iv Hard Facing Of Vertical Coal Pipe Mtr Length After Transition Piece 24Nos In Mill 4A To Mill 4F During Annual Overhaul 2025 26
Mtps I Mill Plant Unit Iv Hard Facing Of Vertical Coal Pipe 1Mtr Length After Transition Piece 24 Nos In Mill 4A To Mill 4F During Capital Overhaul 2025 26
Replacement Of Feeder Outlet Isolation Gate, Transition Piece, Centre Feed Pipe With Mixing Box Assembly, Raw Coal Chute With Coal Reject Inlet And Repairing Of Mixing Boxes And Outlet Body Of Main Inlet Gates Of Hot Pa Ducts Of Coal Mills Bbd4760 Replacement Of Feeder Outlet Isolation Gate Transition Piece Etc Of Coal Mill
Supply of 30 Ms Transition Coupling With Sealing Rubber Gasket Size-9 Od Of Pipe 255Mm X 10 Od Of Pipe 275Mm Ms Transition Coupling With Sealing Rubber Gasket Size-14 Od Of Pipe 386Mm X 15 Od Of Pipe 410Mm Ms Transition Coupling With Sealing Rubber Gasket Size-20 Od Of Pipe 530Mm X 21 Od Of Pipe 560Mm
Mtps I Mill Plant Unit Ii Dismantling Patch Welding And Assembling Of Mill Outlet Elbows Orifices Transition Pieces Fabrication Of Spool Piece Multiple Port Outlets Etc Hard Facing Of Vertical Coal Pipe 1Mtr Length After Transition Piece 24 Nos
Supply Erection Commissioning And Testing Of Condenser Cooling Water Inlet Transition Pipe And Spool Piece In Unit I For Sea Water Application
Dismantling And Shifting Of Screw Conveyor Inside The Mill, Re Erection Including Tie Rods, Screw Conveyor Bearing Housing And Stuffing Box, Replacement Of Eroded Feed Pipe, Mixing Box And Transition Piece With New Spares, Replacement Of Screw Conveyor Removable Shaft Of Unit 5 & 6 Mills During The Annual Overhaul Period 2024-25