Ie Services For Supervision Construction Of New 4lane With Paved Shoulder From Dareota Village-kalar Bala Village Of Nh-205 Chainage Km.33.175-km41.000 Tl 7.825km Including Twin Tube Tunnel Pkg-iib In Himachal Pradesh Under Nho On Ham 2nd Call
Annual Plan-132/2025-26-Nayabazar Kainoth Tunnel Road Re Tarring-Chemnad Gp-General Civil Work
Cs Of Dpr For Critical Location Of Cafeteria Mor Ramban To Provide Restoration Measure Of Existing Tunnel Realignments Alternate Solutions To The Extent Required Etc. To Make This Loc. Allweather Trafficworthy Safe For Operations In Nasri Ramban Nh44
Maintenance Of All Electrical Automation And Instrumentation Systems Of Thin Slab Casters Tunnel Furnace And Inline Hot Strip Mill For A Period Of Two Years At Nsl Nagarnar
Providing Finishing Concrete In The Invert Of The Main Access Tunnel Mat From Ch 0 To 1000 M Kpshep-09/2025-2026
Providing Curved Roofing Using Colour Coated Cgi Sheets With Required Frames In The Main Access Tunnel Wherever Necessary From Ch 0 To 1000 M For Draining The Seepage Water Kpshep-10/2025-2026
Work Of Alignment Marking On Ground Level And Fixing Of Chainage Stone On Jeur Tunnel Alignment And Publishing Gat No Of Land On Jeur Tunnel Alignment In Government Gazzet Ta. Karmala Dist. Solapur
Construction Of Approch Road For Jeur Tunnel Work Shaft No 1 Under Lift Irrigation Scheme No.1 Stage 1 Under Kmip Ta. Karmala Dist Solapur
Spillways /dams /barrages / Aqueducts / Bridges/head Regulater/ Cross Regulater/tunnels/ Syphan, Falls, Canals Construction Works/ Canal Pacca Works/canal Lining Works/ Drains Construction Works/ Drains Pacca Works, Construction Of Ghat/ Cattel Ghat.
Electrical Work In C/w Improvement Of Lighting Arrangements In Ventilated Tunnel T-80, In Bahl Section Of Jammu Division.