Construction Of Balance Work Of Bi-directional Tunnel At Km 83rd And A Major Bridge Between Km 82.675 And Km 82.925 On Nh-244 In The Ut Of Jk On Epc Mode Nhidcl/jk/nh-244/epc/ Tunnelkm83/2025-26
Non Comprehensive Annual Maintenance Work At Various Tunnel Shaft Outlets Under Ae Maint Ww Citys Section
Renovation Work By Sdbc Till Tunnel Road Lake
Supply of Laser Height & Stagger Gauge For Bg Line 1676 Mm As Per Attached Technical Specifi Cation: Physical Weight & Dimensions Weight: 8.5 Kg Maximum Length :1845 Mm Height: 1620 Mm Width: 265 Mm Measures Cable/Ohe Wire Stagger Range: + 520 Mm Accuracy: + 10 Mm @5M Resol Ution: + 0.1 Mm Measures Cable/Ohe Wire Height Range: 2M To 100M Accuracy: + 3.0 Mm Resolutio N: + 0.1 Mm Measures Cant/Super-Elevation Range: + 180Mm Accuracy: + 1.0Mm Resolution: + 0.1 Mm Refos Rail Edge To Face Of Structure Bracket Range: 2M To 100M Accuracy: + 3.0Mm Resoluti On: + 0.1Mm Features: 1. Firm And Robust Base Design And Fully Insulated 2. Expected Battery Life Of 1 Year 3. Best Quality Of Laser Meter Min 1 Year Warranty/Guarantee With Back Light On Laser Displa Y For Night \ Tunnel Work 4. Auto Power Off Facility 5. Carry \ Storage Case For Complete Assembly. Ma Ke - Abtus, Model No. Abt4640 Or Similar In Hilti Or Similar In Other Reputed Brand. Is 1676 Warra Nty Period: 30 Months After The Date Of Delivery
Civil Work At Hypersonic Wind Tunnel Facility Building No T- 244 At Terls Vssc
Taking Trial Bore For Detailed Investigation Of Tunnel For Kharbi Diversion Work
Permanent Restoration Of Tunnel Ventilation Control Roomtvcr Connectivity Work At Natuwadi Tunnel Of Konkan Railway
Repair And Maintenance Of Drainage Pumps, High/Low Trade Waste Water Pumps And Water Supply Cope Point At Pier-1 Including Connected Allied Work In Tunnel Services At Nsry
Engagement Of Proof Consultant Pc For Design Audit Work Of Nhai Tunnel Work
Construction Of Flood Protection Work On Tunnel Pati Nallah At Hariganwan Near The H/O Mushtaq Ahmad Chechi And Others