Acsmt-Kyn:- Augmentation Of Existing Rcc Box Br. No. 0/5 1M X 2M Near Carnac Bridge By Rcc Box Of Size 2M X 2M From Dnth To 7Th Line. Irpsm Id No. 01.02.32.25.3.51.010. Bcsmt-Kyn:- Additional Waterway At Br. No. 8/1 At Km 8/200-250 By 2 X 1.2M Np-4 Rcc Pipe By Microtunneling Method. Irpsm Id No. 01.02.32.25.3.51.002. Cprovision Of 2 X 1M Np-4 Rcc Pipe At Km 17/900-18/0 At Vvh Station By Mirco-Tunneling Method In Csmt-Kyn Section. Irpsm Id No. 01.02.32.25.3.51.005 C.Provision Of 2 X 1M Np-4 Rcc Pipe At Km 17/900-18/0 At Vvh Station By Mirco-Tunneling Method In Csmt-Kyn Section.
Micro-tunneling With Supply And Laying Of 160 Mm Hdpe Pipe Pe-80, Pn-6 Hdpe Pipe And Laying Of 11 Kv, 3c, 300 Sq Mm Xlpe Cable For Length Of 1.3 Km For Nsc I.r.o M/s Lumino Industries At Jangalpur Under Howrah-2 Division Of Howrah Region Rm/hro/e/e-t/25-26/14
New Ht Bulk Connection I.r.o The Partner Yash Jain Of Anjy Estates Llp At Shubharara By Laying Of 11 Kv Ug Cable With 185 Sq. Mm 3c Xlpe 450 Mtr. Through Micro-tunneling And 60 Mtr. In The Existing Trench Under Uluberia Division Of Howrah Region Rm/hro/e/e-t/25-26/15
Repairing And Renovation Of Existing Median Near Al-Bl Crossing, Painting Repairing Of Footpath Allied Walls At Street No. 03 Repairing Of Mastic Asphalt Road After Micro Tunneling For Damaged Drainage Line And Nits Allied Works At Salt Lake By- Wbmad/Ndita/32/2025-26/Sl.01
Micro-tunneling With 160 Mm Hdpe Pipe Pe-80, Pn-6 Hdpe Pipe And Laying Of 11 Kv, 3c, 300 Sq Mm Xlpe Cable For Route Length Of 1.5 Km For Bifurcation Of Jalan-i Feeder From Regent Sme 33/11 Kv Sub-station Under Howrah-2 Division Rm/hro/e/e-t/25-26/13
Micro-tunneling With 160 Mm Dia Hdpe Pipe Pe-80, Pn-6 Hdpe Pipe And Laying Of 11 Kv, 3c, 300 Sq Mm Xlpe Cable For R/l-1.5 Km For Bifurcation Of 11 Kv Jalan-ii Feeder From Regent Sme 33/11 Kv Ss Under Howrah-2 Division Rm/hro/e/e-t/25-26/11
Supplying And Laying Of Cable Through Micro Tunneling Near Kamalgazi Flyover. 11/ee/ed-iii/em/kmda Of 2025-26 Dated 24/07/2025
Micro-tunneling With 160 Mm Dia Hdpe Pipe Pe-80, Pn-6 Hdpe Pipe And Laying Of 11 Kv, 3c, 300 Sq Mm Xlpe Cable For R/l-0.720 Km For Bifurcation Of 11 Kv Industrial-2 Feeder From Jangalpur-1 33/11 Kv Ss Under Howrah-2 Division Rm/hro/e/e-t/25-26/10
Micro-tunneling With 160 Mm Hdpe Pipe Pe-80, Pn-6 Hdpe Pipe And Laying Of 11 Kv, 3c, 300 Sq Mm Xlpe Cable For R/l-1.84 Km For Bifurcation Of 11 Kv Pijush And Payodhi Feeder From Jangalpur-ii Ss Under Howrah-2 Division Rm/hro/e/e-t/25-26/08
Micro-tunneling With 160 Mm Hdpe Pipe Pe-80, Pn-6 Hdpe Pipe And Laying Of 11 Kv, 3c, 300 Sq Mm Xlpe Cable For R/l-1.64 Km For Bifurcation Of 11 Kv Saraswati Bridge Feeder From Srijan 33/11 Kv Ss Under Howrah-2 Division Rm/hro/e/e-t/25-26/09