Implementation Of Mitigation Measures Rock Bolting, Shortcreting And Grouting To Prevent Boulder Fall And Seepage In Existing 8 Nos. Tunnels Tunnel No. 3, 4, 11, 14, 23, 25, 29 & 32 In Kr Line Under Traffic Block Conditions Under The Jurisdiction Of Assistant Divisional Engineer/Lakshmipur Road On Koraput-Rayagada Line Of Waltair Division.
Desilting Of Side Drains, Catch Water Drains, Tunnels Inside Drains, Jungle Cleaning Of Tunnel Faces, De-Weeding The Track And Supply Of Excavator For Mrt Under The Jurisdiction Of Sr. Den/Central/Wat.
Deepening And Cleaning Of Side Drain In Cuttings And In Tunnels Under Sse/Vilavade Section.
Deepening And Cleaning Of Side Drain In Cuttings And In Tunnels Under Sse/Kankawali Section.
Insulation Of Pasteurized Tunnels With Puf Roofing And Puf Insulated Doors To The Tunnels, Filling Of Basement With Earth And Other Misc. Work At Rmrc Murthal
Provision Of Rag Bolt Inside Tunnels Nutun, Mbq, Parsik, Belapur Hb & Bsu Line In Mumbai Division.
Consultancy Services For Feasibility Study, Prep Dpr For Design And Const Of Uni-direction Twin Tunnels Ganglakha- Gedu On Phuentsholing-thimphu Highway 1.8 Km Long Incl Civil, Electrical, Mechanical, Approach Wks To Nhdl Spec Proj Dantak In Bhutan
Repairs Of Ballastless Track In Barcem And Karwar Tunnels In Karwar Region Of Konkan Railway E Office File No : 57251
Design, Manufacture, Supply, Installation, Testing & Commissioning Of Microprocessor Based Electronic Interlocking System Rdso Spec No. Rdso/spn/192/2019 Ver. 2 With Latest Amendment At Abu Road Alteration, Indoor & Outdoor Work, Ambaji, Siyawa & Kui Stations Along With Sitc Of Various Indoor & Outdoor Signalling & Telecom Systems/gears. The Work Includes Addition/alteration In The Existing Electronic Interlocking At Abu Road Station Alteration In Existing Kyosan Make Ei & Associated Indoor And Outdoor Works In C/w New Bg Line In Abu Road - Taranga Hill Section. The Work Includes Excavation Of Trench, Laying Of Cables In Polyolefin Duct/rcc Half Round Pipes/gi Pipe/dwc/hdpe/trench Etc., Casting Of Foundations Of Macls Signals/ Apparatus Cases, Supply-installation Of Point Machines, Apparatus Cases, Macls Signals, Track Circuit Equipment Dc Track Circuit & Single Msdac In All Stations Yards, Earthing, Data Loggers, Eld, Facs, Afdas, Iot Based Rdpms Etc. The Work Also Includes Signalling And Telecom Work For Shifting Of Existing S&t Gears Lc Gates, Signals And Location Boxes, S&t Cables, Hassdac, Etc. For Removal Of Infringements Of S&t Gears Coming In Alignment In C/w New Bg Line In Abu Road - Taranga Hill Section. The Telecom Work Includes Design, Supply, Installation, Configuration, Testing And Commissioningsitc Of Telecom Indoor And Outdoor Equipment Including Integrated Communication Systems For Tunnels Along With Video Surveillance/pa & Emergency Sos Communication, Ip-mpls System With Power Supply Arrangement, Trenching, Laying, Jointing And Termination Of 4*48 Fibre Ofctwo On Each Side Of The Track Cable And 6 Quad Cable Along With Provision Of Passenger Amenities And Other Telecom Works At Stations, Block Sections, Tss/sp/ssp Etc. In C/w New Bg Line In Abu Road - Taranga Hill Section Of Ajmer Division Of North Western Railway
Pmc Servicaes For Construction Of 2 Lane Bypass Of Karnaprayag 4km Bypass With Tunnels 2.89 Km Panduwakhal Bypass 10km With Tunnels 1.795 Km Kainchidham Bypass 1.9km With 0.325 Km Tunnel Bageshwar Bypass 2.38 Km With 1.1 Km Tunnels