Engineering, Procurement, Construction Epc With Commissioning Including Testing, Trial Run And Comprehensive O & M & R Of Common Steam Plant - Turbine Power Generation & Steam Distribution Network For The Capacity Of 360 Tph And 34 Mw At Bulk Drug Park Industrial Estate, Jambusar,
Engineering, Procurement, Construction Epc With Commissioning Including Testing, Trial Run And Comprehensive O & M & R Of Common Steam Plant - Turbine Power Generation & Steam Distribution Network For The Capacity Of 360 Tph And 34 Mw At Bulk Drug Park Industrial Estate, Jambusar,
Engineering Procurement Construction Epc With Commissioning Including Testing Trial Run And Comprehensive Operation And Maintenance And Repair Of Common Steam Plant Turbine Power Generation And Steam Distribution Network For The Capacity Of 360 Tph And 34 Mw At Bulk Drug Park Industrial Estate
Supply of Hybrid Power Plant, 6 5 Kva Hybrid Power Plant And Wss Facility Solar Panel Wind Turbine Battery For Hybrid Power Plant Inverter For Hybrid Power Plant Installation Charge
Repair Maintenance And Installation Of Plant Systemsequipments Version 2 - Nuclear Power Plant; Power Generators Nuclear Power Turbine Overhauling; As Per Scope Of Work And Technical Specification
Assets Insurance Service - Contractors All Risk Car For Civil Works Of 2X700 Mw Nuclear Power Plant Turbine Island Package For Kaiga Atomic Power Project 5 And6; Property Damage Cover Standard Fire & Special Perils Cover Storm Typhoon Hurric..
Design, Supply, Installation, Testing And Commissioning Of 210 Kw Grid Connected Hydrokinetic Turbine Power Plant And Its Integration With Existing 415 Volt Bbmb Grid System Including Transmission System For Evacuation Of Power And Operation And Main
Design, Engineering, Supply, Erection, Testing And Commissioning Of Latest Distributed Digital Control Monitoring And Information Systems Ddcmis For Open Loop Control Systems Olcs, Closed Loop Control Systems Clcs, Fsss, Soot Blower Systems, Turbine Protection Systems And Power Plant Controls In Unit – Iii
Design, Supply, Installation, Testing And Commissioning Of 210 Kw Grid Connected Hydrokinetic Turbine Power Plant And Its Integration With Existing 415 Volt Bbmb Grid System Including Transmission System For Evacuation Of Power And Operation And Main
Design, Engineering, Supply, Erection, Testing And Commissioning Of Latest Distributed Digital Control Monitoring And Information Systems Ddcmis For Open Loop Control Systems Olcs, Closed Loop Control Systems Clcs, Fsss, Soot Blower Systems, Turbine Protection Systems And Power Plant Controls In Unit – Iii.