Work Of Gas & Steam Turbine Hydraulic Skid Preventive Maintenance With Requires Spares For Ccpp-iii, Dhuvaran
Mtps I Tm Unit Iv Removal And Re Insulation Of Hp Ip Control Valve Area Spindle Leak Off Lines Gland Steam Pipes Of Lp Front Rear In Main Turbine During Annual Maintenance Work 2025 26
Ci Division Annual Maintenance Works Of Ci Field Instrument Dcs System Work Stations Turbine Supervisory Instruments And Control Valves Of Turbine Generator Area During Aoh2025 Ot 35/25-26
Mtps I Tm I Unit Iv Annual Maintenance Work In Main Turbine And Its Auxiliaries During 2025 26
Bi Annual Contract For Routine Cum Breakdown And Annual Shutdown Maintenance Work Of Turbine Generator Penstock System Draft Tube Gate System Fire Fighting System Etc At Mahi Ph 2 Bagidora
Bi Annual Contract For Routine Cum Breakdown And Annual Shutdown Mechanical Maintenance Work Of 2x25 Mw Turbine Generator Penstock System Draft Tube Gate System Fire Fighting System Etc At Mahi Ph 1 Banswa Bi-annual Contract For Mechanical Maintenance Work
Routine, Breakdown, Preventive Maintenance, Condition Monitoring, Supervision Of Remote Sites And Overhauling Jobs Mechanical Work Of Turbine, Generator And Their Auxiliaries, Regenerative System, Pumps, Valves, Balance Of Plant Etc. Of 210 Mw, Un Amc For Routine, Breakdown, ...
Rotor Repair Work Of Mill Turbine No 1 Sl No 290019 Model No 290 Mm
Work Of Insulation Of Turbine, Valves, Pipelines Of Turbine Side During Overhauling Of Unit 13, Btps, Obra
Inspection And Over Hauling Work Of Turbine Unit 1 250 Mw Sstps Suratgarh Ssw-01-Tm