Enquiry For Procurement Of Various Consumable Items For 600mw Turbo Generator Of Unit 1 At 2x600mw, Sstpp, Mppgcl, Dongalia.
Annual Overhauling Of 500mw, Kwu Design Bhel Make Turbo Generator Set Including Machining Of Exciter Rotor Slip Ring Area And Exciter Overhauling And Tdbfp Drive Turbines Of Unit No.6 At Ukai Tps E Ts No 3200
Ttps Es Circle Em I Unit Ii Annual Maintenance Of Turbo Generator Ii And Its Allied Works To Be Carried Out During The Overhauling Period For The Year 2025 2026
Ttps Es Circle Mrt I Annual Overhauling Works In Boiler Side Valves Dampers Id Fd Pa Fans Lub Oil Panels And Turbo Generator Ac Dc Lub Oil And Generator Dc Seal Oil Ac Seal Oil System In Unit Ii For The Year 2025 26
Mtps-I Es Circle Emi Uniti Releasing Of Hydrogen Cooler In Any One Generator Casing Cleaning Of The Cooler Tubes, Replacing The Water Boxes Gaskets, Conducting Hydraulic Test, Reassembling Of The Hydrogen Cooler With Turbo Generator Casing And Dism Ce-Mtpsi-Se-Es-Emi-Ot104-25-26
Ttps Es Circle Em I Unit Ii Maintenance Of Lt Motors Driving Turbo Generator Ii S Auxillaries With Rating Ranging From 3 7 Kw To 30 Kw During The Annual Overhauling Period For The Year 2025 2026
Ttps Es Circle Em I Annual Maintenance Of Turbo Generator Ii Auxiliaries Stator Water System Seal Oil System And Earth Pit Cleaning During The Statutory Overhauling Of The Unit Ii For The Year 2025 2026
Aoh Services Turbine And Turbo Generator
Enquiry For Procurement Of Various Consumable Items For 600mw Turbo Generator Of Unit 1 At 2x600mw, Sstpp, Mppgcl, Dongalia.
210 Mw Lmw Design Capital Overhauling Coh Of Turbo Generator Set And Its Auxiliaries Of Unit Iv Mtps I During The Year 2026 27