"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders for turret punch press

Total 2 tenders found
#TBR: 32342061 Closed

Railways Transport

  • Uttar Pradesh
  • Due On: 21 Aug, 2024 (0 Days Left)

Supply of Stripper For Turret Punch Press.

Ref. Document
View Tender
#TBR: 29082008 Closed

Security Services

  • Telangana
  • Due On: 06 Sep, 2023 (0 Days Left)

Custom Bid For Services - Preventive Maintenance Services For Critical Machines For Two Years For These 23 Machines Preventive Maintenance Has To Be Carried Out 6 Times Servicing Per Two Years Ie 6 X 23 138 No Of Servicings As Per Introduction A.., Custom Bid For Services - Preventive Maintenance Services For Large Machines For Two Years For These 19 Machines Preventive Maintenance Has To Be Carried Out 4 Times Servicing Per Two Years Ie 4 X 19 76 No Of Servicings As Per Introduction And S.., Custom Bid For Services - Preventive Maintenance Services For Medium Machines For Two Years For These 45 Machines Preventive Maintenance Has To Be Carried Out 4 Times Servicing Per Two Years Ie 4 X 45 180 No Of Servicings As Per Introduction And.., Custom Bid For Services - Preventive Maintenance Services For Small Machines For Two Years For These 104 Machines Preventive Maintenance Has To Be Carried Out 4 Times Servicing Per Two Years Ie 4 X 104 416 No Of Servicingsas Per Introduction And.., Custom Bid For Services - Maintenance Services Oils Topping Cleaning For Cnc Machining Centres At Cnc Shopsthe Period Of Work Is Two Years Ie For 8 Quartersx 10 Machines 80 Quarters As Per Introduction And Sow, Custom Bid For Services - Maintenance Services Oils Topping Cleaning For Cnc Lathe Machines At Cnc Shopsthe Period Of Work Is Two Years Ie For 8 Quartersx 5 Machines 40 Quartersas Per Introduction And Sow, Custom Bid For Services - Maintenance Services Oils Topping Cleaning For Cnc Wire Cut Sink Edm Machines At Cnc Shop The Period Of Work Is Two Years Ie For 8 Quartersx 2 Machines 16 Quarters As Per Introduction And Sow, Custom Bid For Services - Maintenance Services Oils Topping Cleaning For Cnc Turret Punch Press At Cnc Shop The Period Of Work Is Two Years Ie For 8 Quartersx 1 Machine 8 Quarters As Per Introduction And Sow, Custom Bid For Services - Maintenance Services Oils Topping Cleaning For Cnc Paso Engraving Machines At Cnc Shop The Period Of Work Is Two Years Ie For 8 Quartersx 1 Machine 8 Quarters, Work Is Two Years Ie For 8 Quartersx 1 Machine 8 Quarters As Per Introduction And Sow, Custom Bid For Services - Maintenance Services Oils Topping Cleaning For Cnc Tool Cutter Grinding Machine At Cnc Shopthe Period Of Work Is Two Years Ie For 8 Quartersx 1 Machine 8 Quarters As Per Introduction And Sow, Custom Bid For Services - Maintenance Services Oils Topping Cleaning For Cnc Laser Engraving Machines At Cnc Shop The Period Of Work Is Two Years Ie For 8 Quartersx 1 Machine 8 Quarters As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killer Of 3600 Cmh For Dmg 160 Fd Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Combined Fume Killer Of 3600 Cmh For Dmu 60 P Vcp 600 Mikron Cnc Machines For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Dust Collector Of 1700 Cmh For Linishing Machine At Pcb Department For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Combined Fume Killer Of 2000 Cmh For Dmc 60H Cnc Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killers Of 2000 Cmh For Walter Helitronic Powergrinding Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killers Of 2000 Cmh For Cnc Sink Edm Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Combined Fume Killers Of 3600 Cmh For Lathe Machines At Pms Shop For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killer Of Fk 3600 For Vr3a 1 By 1 Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killer Of Fk 3600 For Vr3a 1 By 2 Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killer Of Fk 3600 For Vr3a 1 By 3 Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Yearsas Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killer Of Fk 3600 For Vr3a 1 By 4 Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killer Of Fk 3600 For Okk Milling Machine For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Combined Fume Killer Of Fk 3600 For Al1al2 And Sl Lathe Machines For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Dust Collector Of Fk Db 3000 Cmh For Wok Bench At Cnc1 Section For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Dust Collector Of 1700 Cmh For Engraving Machine In Cnc1 Section For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years, Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killer Losma Pascal Nano 2500 For Brazing Application At Fabrication Hanger For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And Sow, Custom Bid For Services - Camc Of Fume Killer Losma Pascal Nano 2500 For Tig Welding Application At Fabrication Hanger For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Years As Per Introduction And S.., Custom Bid For Services - Camc Of Fume Killer Makespan Filtermist Model Sf34h 2000 Cmh For Cnc Vmc 600P3 Machine At Slrdc Workshop For This 1 No Servicing Has To Be Carried Out Every 2 Months Ie 12 Times Servicing In 2 Yearsas Per Introduct.., Custom Bid For Services - Camc Of Fume Extractors Filter Size 240 X 240 Mm 370 X 180 Mm Approx Make Bofa And Fumepro In The Factoryfor These 100 Nos For Each Fume Extractor Servicing Has To Be Carried Out Every 6 Months As Per Introduction And .., Custom Bid For Services - Camc Of Fume Extractorsfilter Size 134 X 134 Mm Approx Make Hakkoindexytronicfiltronic Ab For Two Years For These 132 Nos For Each Fume Extractor Servicing Has To Be Carried Out Every 6 Months As Per Introduction And So.., Custom Bid For Services - Camc Of Fume Extractorsfilter Size 270 X 220 Mm 280 X 280 Mm Appr Make Hakkoindexyronicfiltronic Abweller For 2 Yearsfor These 244 Nos For Each Fume Extractorservicing Has To Be Carried Out Every 6 Months As Per Introducti..

23.35 Lacs
View Tender
Download Document