Repair Works Of Piers, Pier Caps, Viaducts, Station Buildings And Other Structures Of Stations From Lajpat Nagar To Raja Nahar Singh Metro Stations Of Line- 06.
Rehabilitation Of Various Structural Elements Of Viaduct Portions Of Blue Line From Km (-)6.23 (kdsw) To Km 0.0 (kdmi) And From Km 16.45 (kmuk) To Km 25.135 (kkvs) Of Metro Railway, Kolkata.
Design And Construction Of Main Line Elevated Viaduct From Thakurganj Metro Station To Vasantkunj Metro Station Including 5 Nos Of Elevated Metro Stations Design And Construction Of Main Line Elevated Viaduct From Thakurganj Metro Station To Vasantkunj Metro Station
Performance Based Maintenance Contracts Pbmc Work Of National Highway 10 Ch. 26.000 To 52.100 From 29th Mile And Rangpo Viaduct In India In The State Of West Bengal In Fy 2025-26 2nd Call
Emergent Restoration Work By Bituminus Of Approach Road Of Northern Viaduct Bally Bridge In Patches During The Year 2025-26 Wbpwd/ee/hd/niet85/2025/26
Carrying Out Of Instrumentation Of Metro Viaduct In Between Dumdum Cantonment Station To Jessore Road Station Of Metro Railway.
Art Work On Viaduct Piers In Line-2 And 5 And At Other Lines, Delhi Region Of Dmrc.
Handrail Painting Of Viaduct Structure, Walkway Plates And Shearkey Cover Plates During Power Block Night Hours
"providing Project Management Services Engineering, Procurement And Construction (epc) Contracts And Other Works Contracts ( Item Rate Contracts) For Doubling Project Between Agthori Station (km 393.380) To Kamakhya Station (km 401.120) Including Construction Of 2nd Rail Cum Road Bridge Over River Brahmaputra Including Viaduct, Retaining Walls, Embankment And Minor Bridges Including Track Work, Ohe Work, Signaling And Telecom Work And General Work In Connection With Agthori - Kamakhya Doubling Project Of Northeast Frontier Railway In The State Of Assam." And "engineering, Procurement And Construction (epc) Contracts And Other Works Contracts (item Rate Contracts) For Doubling Of Track Between Azara (163.000 Km) (including) And Kamakhya Stations (including)up To Km 176.000 (13 Km) Including Electrification And Signalling Works In Connectionwith New Bongaigaon -goalpara Town - Kamakhya Doubling Project Of Northeast Frontier Railway."
Improvement Of Structural Life Of Track Girder Bridge By Sand Blasting & Metalizing Of Wadibunder Viaduct Br. On Csmt-cla (hb) Line.