Provision Of Additional Water Filling Arrangement In Different Type Of Lhb Coaches As Per Rcf Coach Alteration Instruction - Cai/rcf/mech/lhb/061
Hiring Of 1 No. 8kl Capacity Water Tanker For Filling The Water In Drills For A Period Of 36 Months.
Supply Of Water Filling Connector With Clamp
Supply Of Modified Coach Water Filling Connector With Clamp To Drg. No. Mi006153 Alt -a As Per Rcf Specn Mdts-203, Rev-06.make:-ntech Or Similar
Supply Of Connection For Side Filling Of Roof Water Tank
Supply Of Water Filling Connector With Clamp.
Supply Of Connection For Side Filling Of Roof Water Tank.
Supply Of Nozzle End And Gasket For Water Filling Connector
Supply Of Modified Coach Watering Inlet (connector) With Strainer And Modified Coach Water Filling Connector With Clamp.
Strengthening Of Water Filling Point At Ac 4 And Dumper Pass Under Conveyor At Kocp Of Kusmunda Area.