Estimate For Strengthning And Restoration Of Both Bundhs Of River Ghaggar From Rd 58000-131628 Under Jurisdiction Of Executive Engineer, Drainage Cum Mining And Geology Division, Water Resource Department Punjab.
Water Resource Management Works Creation Of Water Body At Chaulakhai Under Badagada Range
Fdr Restoration Of Existing Unlined Canal Daibya Nath Land To Near Maonoranjan Nath Shib Kali Mandir At Radhapur Gp Of Jubarajnagar Block Under Water Resource Sub Division Dharmanagar During The Year 2025 26 Sh Cleaning Of Unlined Canal L 3 00 Km
Maintenance Of Different Mi Schemes Under Teliamura R.d. Block During The Year 2025-26 Under Water Resource Sub-division Teliamura /sh - Mtc. Of Priming Tank, Pipe Line Leakage And Other Allied Works Etc. Job No. Tr/60/minor Works/wrd-i/2025-26
Maintenance Of Different Mi Scheme Under Kalyanpur R.d. Block During The Year 2025-26 Under Water Resource Sub-division Teliamura /sh - Mtc. Of Priming Tank, Pipe Line Leakage And Other Allied Works Etc. Job No. Tr/59/minor Works/wrd-i/2025-26
Survo Water Resource Project Annual Maintenance Of Earthen Dam & Spilway For Cleaning The Surface To The Survo Dam Site For The Year 2025-26
Restoration Of Pump Motor And Electrical Equipments Etc. With Allied Works Restoration Of Different M.I Scheme Under Bagafa Block Under Water Resource Sub-Division, Santirbazar, South Tripura Dist. During The Year 2025-26
Restoration Of Pump Motor And Electrical Equipments Etc. With Allied Works. Restoration Of Different M.I Scheme Under Jolaibari Block Under Water Resource Sub-Division, Santirbazar, South Tripura Dist. During The Year 2025-26
Construction Of V-notch For Seepage Measurement In Downstream Of Left & Right Side Earthen Bund For Aji-iv Water Resource Project
Repair And Maintenance Work Of 108 Nos. Sluice Gates Of 98 Nos. Minor Tanks Under Water Resource Division