Gem Bids For Lv1 Wzt 3 Pn 74 E 90161 L 60mm Braid Plc 10 16 L 60mm , Lv1 Wzt 3 Szr20u5esz7 Plug Szr20u5esz7 , Lv1 Wzt 3 Szr16p2ng5 Plug Szr16p2ng5 , Lv1 Wzt 3 Pn 74 E 90161 4 Braid Plc 6 10 L 15800mm , Lv1 Wzt 3 Szr16u2eg5 Pos 689 Plug Szr16ueg5 , Lv1 Wzt 3 Szr20u2esz6 Pos 696 Plug Szr20u2esz6 , Lv1 Wzt 3 170 70 066sb 2 Cover In The Set , Lv1 Wzt 3 Pn 74 E 90161 5 Braid Plc30 40 L 60mm , Lv1 Wzt 3 Pn 89 C 89209 Zn 94 Zut 1 06 Hose Z Pvc P White Or Cinereous I O 36x3 0 L 90mm Pololefin Thermoshri , Lv1 Wzt 3 Pn 74 E 90161 6 Braid Plc 6 10 L 120mm , Lv1 Wzt 3 Sb 8 Joint With Nut Sb 8 Plug , Lv1 Wzt 3 170 107 047sb Plate In The Set , Lv1 Wzt 3 Szr28pk7esz9 Holder Szr28pk7esz9 , Lv1 Wzt 3 Pn 80 H 93830 L 400mm Wire M1 Er 0 5 L 400mm , Lv1 Wzt 3 Sz12 000 223 Sending Receiving Device R 173 , Lv1 Wzt 3 If2 067 012 Wave Trap Block R 173 14 , Lv1 Wzt 3 Pn 85 M 82105 2 Bolt M 6x30 8 8 A Fe Zn8c , Lv1 Wzt 3 Zs 1 Pod 72 Periscope Pod 72 , Lv1 Wzt 3 B 71 36 32z 1 Sleeve Assembly
Gem Bids For Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Three Phase Manual Isolators (ds) Preventative Maintenance (total Quantity 1 Is Equal To 19 Numbers .. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Three Phase Motorized Isolators (ds) Preventative Maintenance (total Quantity 1 Is Equal To 17 Numbe.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Assistance In Preventative Maintenance Of Three Phase 220kv Sf6 Circuit Breaker (total Quantity 1 Is Equal To 10 Numb.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Assistance In Preventative Maintenance Of 220 / 132 Kv Three Phase Mocb (total Quantity 1 Is Equal To 2 Numbers For T.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Cleaning And Tightness Of 220 Kv Switchyard Single Tension / Suspension String For Single Conductor (total Quantity 1.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Cleaning And Tightness Of 220 Kv Switchyard Double Insulator Suspension String For Single Conductor (total Quantity 1.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Overhead Connectors (t Connection), Clamp / Joints Inspection, Cleaning And Tightness Checks And Rep.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Overhead Connectors (y Connection), Clamp / Joints Inspection, Cleaning And Tightness Checks And Rep.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Line Tension Insulator Cleaning And Tightness Of Wall Bracket For Support At Tb Wall (total Quantity 1 Is Equal.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Cleaning And Tightness Of Sky Ground Wire Connections (tower Top And Ground) (total Quantity 1 Is Equal To 51 Set For.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Insulators Cleaning, Inspection And Connection Tightness Of Ct / Pt / Cvt / La / Sut / Gt Hv Bushin.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Assistance For Disconnection And Connection Of 220kv Ct / Pt / Cvt / Gt / Sut / Ut Terminals For Diagnostic Testing O.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Line Wave Trap Cleaning, Inspection And Connection Tightness (total Quantity 1 Is Equal To 7 Numbers For Two Ye.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Bus Post Insulators (vertically Mounted On Ground) Cleaning, Inspection And Connection Tightness (to.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 21 Kv Isolated Phase Bus Duct Cleaning, Inspection And Connection Tightness And Replacement Of Gasket And Sealing Etc.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, 220kv Switchyard Overhead Aac Strained All Aluminum Conductor / Jumper Replacement Up To Twenty Meter Length Piece (t.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of 220 / 132 Kv La (total Quantity 1 Is Equal To 6 Numbers For Two Years); As Per Scope Of Work And Atc , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Single Tension / Suspension String / Wave Trap (of 220kv Switchyard) For Single Conductor (total Quant.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Double Insulator Suspension String Set (of 220kv Switchyard) For Single Conductor (total Quantity 1 Is.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of 220kv Switchyard Bus Post Insulator (total Quantity 1 Is Equal To 2 Numbers For Two Years); As Per Sco.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Insulator Of 220kv Switchyard Isolator (ds) / Ct / Pt / Cvt) I.e. Complete Unit Of One Phase (total Qu.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Sky Wire (60 Meter Length Each) Of 220kv Switchyard (total Quantity 1 Is Equal To 5 Numbers For Two Ye.. , Repair, Maintenance, And Installation Of Plant Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of 245 Kv Sf6 Cb / Mocb Complete Unit Of One Phase / Pole (total Quantity 1 Is Equal To 3 Numbers For Two.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Replacement Of Overhead Aac Strained All-aluminum Conductor Of 30 Mm Diameter Replacement Up To 160 Meter Length Piec.. , Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Rr Site 1 And 2; Electrical System Or Installation, Site Visit Charges Of Four Persons From Bidders Premises To Rr Site Unit 1 And 2, For Carrying Out The Operational Em
Gem Bids For Rigid Type Connector & Wave Trap Connector
Gem Bids For Wave Trap/ Line Trap For 132 Kv Switchyard
Gem Bids For 1 Purchase Of 01 No. Wave Trap For 420 Kv Pothead Yard Of Uri-ii Ps
Supply Of 420kv Wave Trap Installed At 2x660mw Csctpp, Chhabra
Gem Bids For 132kV ST without TB for Single Zebra ACS 132kV ST with TB for Single Zebra ACSR 132kV ST w/o TB for Twin Zebra ACSR 132kV ST with TB for Twin Zebra ACSR 132kV SS with DC for Single Zebra ACSR 132KV SS Drop Type Twin Moose/ACSR 132kV SS with TC for Twin Zebra ACSR 132KV SS for Wave trap
Supply Of Wave Trap For 400kv Switchyard
Supply of TERMINAL Connector on LA to Suit 2 ACSR Moose C1 , TERMINAL Connector on BPI to Suit 4.5 IPS AL TUBE C5 , TERMINAL Connector Expansion Type on CB to Suit 4.5 IPS AL TUBE , TERMINAL Connector Expansion Type Horizontal Take Off on ISO to Suit 4.5 IPS AL TUBE C2 , TERMINAL Connector Horizontal Take Off on ISO to Suit 2 HTLS CONDUCTOR C2 , TERMINAL Connector Rigid Type Horizontal Take Off on ISO to Suit 4.5 IPS AL TUBE C2 , TERMINAL Connector Expansion Type On CT 3000A to Suit 4.5 IPS AL TUBE C3 , TERMINAL Connector On CT 3000A to Suit 2HTLS CONDUCTOR C3 , TERMINAL Connector on CVT to Suit 2ACSR Moose C4 , TERMINAL Connector on EMVT to Suit 2HTLS CONDUCTOR C5 , TERMINAL Connector Expansion Type On CB to Suit 4.5 IPS AL TUBE C6 , TERMINAL Connector on WAVE TRAP to Suit 2 HTLS CONDUCTOR C7 , Terminal connector on BPI to Suit 2ACSR Moose C8 , Tee Clamp to Suit 2HTLS to 2 HTLS CONDUCTOR T1 , Tee Clamp to Suit 2HTLS to 4.5 IPS AL TUBE Horizontal Take off T2 , Tee Clamp to Suit 2HTLS to 2ACSR MOOSE CONDUCTOR T3 , PG Clamp to Suit 2ACSR MOOSE to 2ACSR MOOSE CONDUCTOR T4 , T CLAMP FOR INVERTED V CONNECTOR TO SUIT 4.5 IPS AL TUBE T2
Supply Of Mom And Bom Boxes For 110Kv Ab Switches And Erection Of 230Kv Wave Trap For Establishment Of New 230/110 Kv Ss At Sathumadurai Ts.No.022/2024-25 Of Se/Gcc/Salem Mm