Improvement Of Inspection Path Over Kalchity Khal Right Embankment From Gumai Sluice To Kundra Concrete Road Via Bhattapara Wooden Bridge Length 2650 M Within Gp-7 No. Narayanbarh, Block Ps- Sabang And Dist. Paschim Medinipur. Wbiw/Ee/Kkbpd/E-Nit-25/2025-26 Sl 06
Improvement Of Inspection Path Over Kalchity Khal Right Embankment From Ho Madan Hazra To Land Of Tarapada Samanta Via Baharkundra Wooden Bridge Length 3500 M Within Gp-7 No. Narayanbarh, Block Ps- Sabang And Dist. Paschim Medinipur. Wbiw/ee/kkbpd/e-nit-25/2025-26 Sl 04
Improvement Of Inspection Path Over Amrakhali Khal Left Embankment From Khepal Icds To Desghai Wooden Bridge Length 1650 M Within Gp-7 No. Narayanbarh, Block Ps- Sabang And Dist. Paschim Medinipur. Wbiw/Ee/Kkbpd/E-Nit-25/2025-26 Sl 03
Recovery And Reconstruction Of Angthihara Wooden Bridge Road Under Ndrfpdna-2022 For The Year 2025-26 Package No.204 16
Construction Of Wooden Foot Bridge Near Upasi Pukurover Pairashi Khal At Nischintapur Gp Under Daspur-Ii Ps, Fund-15Cfc Jl No. 230.Plot No. 1080
Restoration Of Slipes, Erosions Along The Countryside Of River Rupnarayan Left Bank Over Right Side Of Existing Drainage Channel Parallel To The Rupnarayan Left At Shibpur Near Shibpur Wooden Bridge For A Length Of 30.00M In G.P-Baneswarpur-Ii, Wbiw/Eeii/Ldcd/Enit26/25-26Sl4
Re-Construction Of Wooden Bridge Somruk In Place Of Damage Wooden Bridge Over Kashmul Khal G.P-Hutgacha-Ii, P.S-Uluberia, Block-Uluberia-I, District-Howrah. Wbiw/Eeii/Ldcd/Enit26/25-26Sl2
Construction Of Concrete Road From Shit Wooden Bridge To Harenbera House Under Narayanbarh Gp Under Sabangpanchayatsamity In The District Of Paschimmedinipur Under Rural Road 2025.
Repairs Of Wooden Bridge By Way Of Concrete/Steel Plates From H/O Sameer Ahmad Bhat To Muhammad Ismail Bhat At Lone Mohalla Nowpora
Construction Of Wooden Bridge Over Chouri Nallah In Batote Forest Division Under Sdrf