Supply of Supply, Installing And Fitting Of 5 Manifold Lpg Gas And Pipe Line At Modal Running Rooms Ldh, Under Electrical Op Rso/Fzr Material Required As Per Attached Annexure-I Warranty Period: 30 Mon Ths After The Date Of Delivery