Supply of 4401 Dismantling Of The Existing Side Walls Front Pillars Front Wall And Flooring Removing The Malwa Waste From The Site And Dumping 50 To 70 Meters Away From Scn Raising The Floor Height By 6-8 Inches By Filling Of Waste Material Pcc Flooring Mix Of Cement Sand And Aggregate. Installation Of 1 Ft X 1 Ft Chekker Tiles With Complete Furnishings