Supply of DG Set Control panel with Auto_Manual mode , Power cable 3point 5 C 185 sq mm Al armout FR Grade , Power cable laying , Power cable terminnation , Control cable 6 C 2Point 5 sq mm Cu ar FR Grade , Control cable termination , Control cable laying , Dy tand for 12 hrs supply , Chemical earthing 2 mtr long with GI Pipe , GI Earthing strip32x6mm , Srtip laying , Spares all filters and belts , DCP Fire extenguishers 4 point 5 kg , Diesel for DG testing at available load , Earting works of the DG Set , Installation and commissioning of the DG at site