Epc, Testing, Commissioning, Trial Run For 3 Months After It 9 Month Operation & Maintenance Including Replacement & Warranty Of All Components Of 1 Nos Stps Of Capacitiy 2.80 Mld With Sbr Technology Including Designing, P/L/L/J Of Rcc Np3 Pipes Interceptor Sewer Of Length 123M 400-700 Mm Dia, 2 Nos Collection Chambers, Disposal Line Of Length 100 M 700 Mm Dia And Pumping Station, Di K-9 Pumping Main Of Length 550 M 300Mm Dia Total Length 773 M With All Allied Components Complete On Turn Key Job Basis