Cleaning The Roof Tops Of Various Buildings Such As Power House, Ash Handling, Boiler, Bunker Esp4 And 5 Control Room Cwph 2 Of Unit 4 And 5 At El 3.00M To 52.80 M And Clearing Away The Deposits To Far Off Places For The Period From 01.04.202