Providing Fixing 3.00 Bhp, Generating Set, Construction Of Manhole, Development At Stp, Installation Of Cctv Cameras, On Time Effluent Water Quality Monitoring System, Disilting 8 Pvc Pipe Line And Manholes, Corrugated Sheet, D.I. Pipe As Per Is 8329 Operationalizing The Already Laid Sewerage System In Akbarpur Muhalla Goindwal Sahib