Supply And Erection Of Gauges And Transmitters In Fire Hydrant Mains At A Boiler Drum Floor B Bunker Top And C Near Wagon Tippler Area For Configuring The System Pressure With Dcs At Ucb For Monitoring Fire Hydrant System Pressure.