Independent Engineering Services For Construction Of Churhat Bypass Including Tunnel On Rewa Sidhi Section Of Nh 75 E From Chainage 33.200 To Chainage 55.400 Design Length 15.350 Km. In The State Of Mp On Hybrid Annuity Mode.