Work Of Removal, Fabrication, Erection, Testing And Commissioning Of Ms Or Cs Or Gi Pipes And Fittings Of Various Size, At Various Location For Tg And Bop Area Of Unit 3 And 4, On As And When Required Basis At Stps.