Strengthening Weak Side Slope By Construction Of Toe Wall Murom Filling, Boulder Pitching, Preparing Sub-Bank Dressing Of Bank By 2:1 Slope For Approaches Of Bridge No 552/1, 552/2, 557/3, 557/4 & 557/5 Total 1000*2 2000M In Kui-Wd Section.