Supply And Installation Of New Power Cable And Sub-Main Cable For Scada System From Left Side Main Panel Board To Mahanadi Barrage Left Side Bus Bar No.1 To 8 And Kendrapara Canal Bus Bar No.1 For The Year 2025-26. Mbd66/2025-26