Emergent Temporary Flood Damage Restoration Works At Shoulder And Flank Portion At Ch. 21.47 Km To 21.50 Km Left Side And Ch. 17.20 Km To 17.225 Km Left Side On Jagatpur-Dharampota Road By 150 Mm Dia Eucalyptus Bullah Pilling With Gunny Bag Filli Wbpwd/Ee/Hcd/ Nite-33, Sl-2 Of 2025-2026