Construction Of Pedestrian Subway At Km.211/800-900 Between Rrb-nvf Stations In Connection With Increasing Sectional Speed Upto 130kmph. Sw-1: Rrb-jru Section: Construction Of Pedestrian Subway At Km.211/800-900 Between Rrb-nvf Stations In Connection With Increasing Sectional Speed Upto 130kmph. Sw-2: Launching Of Rcc Box Segments For Pedestrian Subway At Km.211/800-900 Between Rrb-nvf Stations.