[i]bid-ohe Modification In Connection With Provision Of Proposed Rd-06(spur Line Of 686m) With Shunting Neck Of 650m Towards Svc End Du Ly Dismantling Existing Goods Unloading Platform Adjacent To Rd-5 [ii]ohe Modification For Shifting Of Y Tss Down Line Ptfe