The Work Involves Conducting Mock-up Tests At Both The Building Dock And Repair Dock In Csl. Additionally, The Work Includes The Excavation Of Anodes And, If Necessary, The Design Of A New Iccp System Based On The Mock-up Test Results. Conducting Of Mock Up Test Of Iccp System At Building And Repair Docks In Csl