Overhauling And Rewinding Of 325 Kw, 6 Kv, 10 Pole Ht Motor.... Including Repairing Of Stator Core, Dynamic Balancing, Heat Varnishing ... Along With Some Allied Works At Raw Water Pumping Station Inside The Campus Of Ibg Under Hmc Area 15/Ee/Md-V/Em/Kmda Of 2025-26 Dated 31.12.2025