Construction Work On The Proposed Master Plan Road No. 03, With A Length Of 1730 Meters, Located To The Left Of Sultanpur Road And Kishan Path, And Passing Through The Villages Of Bakkas, Chauraya, Chaurasi, Malukpur Nurpur, Behta Mastmau, And Dular Mau.