For The Rabi And Summer Seasons Of 2025-26 Carrying Out Gate Repairs Of Mr7 On Dy5 Of N.m.branch Canal 1 Covering Irrigation Of Section No.13 To 15, Performing Lining Work At Selected Locations, Welding Of Gates During The Rotation Periodsecond Call