Construction Of Mipi-andrathang Road From Km 20.000 To 50.000 Design Length 34.880 Km Between Km 20.000 To 54.880green Field Alignment To Nhsl Specifications In The Aor Of 62 Rcc Under 752 Brtf Of Project Udayak In Arunachal Pradesh State
Construction Of Underpasses At 5 Blackspot Locations In The Project Highway At Specified Locations From Ch. 23.600 To Ch. 149.900 Of Nh34 Old Nh91 From Ghaziabad To Aligarh On Epc Mode In The State Of Uttar Pradesh
Selection Of System Integrator For Maintenance Of Core Banking System Domestic And Overseas And Associated Applications
Construction Of 1800mm Or Dia Microtunneling Of Storm Water Drain From Anjali Four Roads To Chandranagar Four Roads To Ambedkar Bridge To Canal
Microtunneling Of 1800 Mm Dia From Manekbagh Jivraj Mehta Hospital Four Roads In Navrangpura Ward Of Ahmedabad Municipal Corporation West Zone To Dharnidhar Four Roads To Anjali Four Roads Systematic Storm Water Drains Works
Storm Water Drainage Work With 5 Years Defect Liability Period And 10 Years Operation And Maintenance
Engineering Procurement And Construction Epc For Construction Of Married Accommodation For Officers Enrolled Personnel And Civilian Staff At Mayabunder
Construction Of Certain Tech Accn And Other Allied Infrastructure At Khundru Under Ge 861 Ews
Construction Of Various Tp Roads In Kalol Tp 5 In Auda Area
Provn Of Otm Accn For Fd Hospital At Bathinda Mil Stn Provn Of Otm Accn For Fd Hospital At Bathinda Mil Stn Job No Mwp/Swc-07/2024-25