Macdamization Of Road From Barnie To Patoli And Internal Link To Barnie Talab W.No 65 Under City Town Programme 2025-26
Gem Bids For 50ml Conical Tubes Sterile, 500/pk, Color Change 0ºlabtop Cooler (purple Pink) For 0.2 Ml Tubes/strips/plates, 96 Well, 2/pk, Hi-care Triclogel Refill Pack 5 Litre Can Pack, Gene Ruler 1kb Plus Dna Ladder, Dream Taq Pcr Master Mix 200x50 Ul, Tough-spots Red 3/8” Dia-1000/roll, Hi-dispo Bag 14x20, Gs-02 Custom Gene Synthesis In Crispr/cas9vectors/plants Expression Vectors (5 Kb ), Murashige & Skoog Medium Including B5 Vitamins, 25, Etc
Construction Of Integrated Settler With Anaerobic Baffled Reactor And Anaerobic Filter Abr-Af At Kumarsanda Abdaltala Under Kumarsanda Gp Niet No 04/Bdo, Kandi/ Sbm-G/25-26
Construction Of Concrete Road From The Pwd Road To Jahannabi Molla House, Mouza-Bhangankhali, Jl-68, Under Gp- Kanthalberia Under Basanti Ps Wb/Spg/Zp/N-62/7/25-26
Repair And Renovation Works In Septic Room, Female Doctor On-Call Room With Attached Bath, Esclamisa Room, Triage Room Along With Corridor Of Mat An Gynae Ward At College Of Medicine An J.N.M. Hospital, Kalyani Nadia Under Nadia Construction Division Repair And Renovation Works In Septic Room
Construction Work Construction Of Bagichandrapara Awc At Bagichandrapara, Kalapani Adc Village Under R.D. Kanchanpur Division During The Year 2025-26.
Construction Work Construction Of Purba Subhashnagar Ii Awc At Purba Subhashnagar, Khakchang Adc Village Under R.D. Kanchanpur Division During The Year 2025-26.
Construction Work Construction Of Sarpajoypara Awc At Sarpajoypara, West Bhandarima Adc Village Under R.D. Kanchanpur Division During The Year 2025-26.
Construction Work Construction Of Khasnampara 15 Awc At Khasnampara, West Bhandarima Adc Village Under R.D. Kanchanpur Division During The Year 2025-26.
Construction Work Construction Of Bamboobari Ii Awc At Bamboobari, Longai Valley Adc Village Under R.D. Kanchanpur Division During The Year 2025-26.