Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Head End Area Of Bcn-1ab At Tp-1 Including Fg Floor, Gallery Area, Mh-2, Module-1 To 10 And Tail End Area At Mh-1 Including Hgtu By Head Loads On To Running Conveyor Required In Mm/chp/btps From 01.08.2025 Or Actual Date Of Commencement Of Work To 30.11.2025
Providing White Washing And Painting To Certain Quarters In A And B Camps In Colony Division, Ktps- Vii Stage
Clearing Of Shrub Jungle Two Times In A Year In Coal Handling Plant, Ash Handling Plant And Along 30a Conveyor As And When Required In Ktps Stage-vii, Paloncha For The Fy 2025-26
Supply Of Cleaning Consumables For The Project Hostel Building And A Colony Of Yadadri Thermal Power Station 5x800 Mw.
Supply Of Pneumatic Operated Cylinder For Flopper Valve In Mill Rejection System For Xrp-1003 Bowl Mills
Removal Of Spilled Over Coal And Fine Dust At Stacker Cum Reclaimer-1 And 2 And Along And Underneath Of Bcn-8 And 9 Conveyor By Head Loads On To Running Conveyor From 01.08.2025 Or Actual Date Of Commencement Of Work To 30.11.2025
Erection Of New Earth Pits, For Outdoor Power Transformers And Its Associated Lightning Arrestors In Unit Ix And X Of Ktps V Stage.
Ktpp Stores And Services Semi Comprehensive Maintenance Contract Of 10 Passenger Capacity Omega Make 40 Nos Lifts At Various Multi Storey Employees Residential Buildings In The Ktpp Colony For The Period Of 12 Months From The Date Of Purchase Order
Clearing Of Accumulated Coal On The Rails, Poking Of Solid Caked Coal And Hammering Of Boulders And Clearing Of Shales On Track Hopper2 Grid Wagon Tippler3 And 4 Grid, Clearing Of Sticky Wet Coal By Poking Inside Coal Wagons, Engaging Cutter Welder For Opening Closing Of Welded Wagon Doors Whenever Required, Along With Tools And Tackles For Unloading Any Other Miscellaneous Works From 01 07 2025 Or Commencement Of Work To 19 08 2025
Supply Of Spares For Air Compressor- Model T-btd-rm