Ttps Mech Ii Bm Unit I Strengthening Of Weak Welding Joints Of Step Grills Platform Grills Renewal Of Damaged Corroded Structurals From 0 Mtr To 52 Mtr Elevation And Re Routing Of Ash Disposal Pipe Line Of Unit I Boiler
Cleaning The Choked Up Ash In 300nb Dia Mserw Ash Slurry Disposal Pipe Line -1, 2 And 3 From Ash Slurry Disposal Pump House To Nap I And Ab Ash Pond As And When Required During The Year 2025 26
Rotation And Replacement Of 200nb And 300 Nb Ci And Ms Pipe Line Of Esp Hopper And Bottom Discharge Line, Vacuum Line, Ash Slurry Disposal Line During Overhauling Of Unit 3, 2 And 210 Mw, Btps
Ktps-vii Stage-oandm-cam-dismantling Of 300nb Mserw Ash Slurry Disposal Pipe Line Of Ktps-vii Stage I.e., Line-3 From Ab Ash Pond Diverted Point To Northern Ash Pond-i Up To Nap-ii Diversion Point In The Year 2025-26
Installation Of Display Boards At Prominent Places Of Bktps And Tit Bit Repairing Of Damaged Concrete Pedestals Of Ash Slurry Disposal Line At Ash Pond I And Ash Pond Ii.
Dismantling Of Existing Ash Disposal Line-3 At Ash Pond-2 And Erection Of New Slurry Disposal Line-2 At Ash Pond Dyke-1 During The Year 2025-26
Installation Of Display Boards At Prominent Places Of Bktps And Tit Bit Repairing Of Damaged Concrete Pedestals Of Ash Slurry Disposal Line At Ash Pond I And Ash Pond Ii.
Supply And Erection Of 350 Nb Cast Basalt Pipes With Suitable M.S. Coupling Sets And Cast Basalt Fittings For Ash Slurry Disposal Line No 4A, 4B, 5A And 5B Of Unit Iv And V
Nctps Isemii Circle Ahp Dn Unit I Eco Hopper Renewal Of Existing Eroded And Damaged Ash Slurry Disposal Ms Pipe Line With Cast Basalt Pipes And Fittings In Unit I During Available Shutdown
Service Part For Renovation Of Ash Slurry Disposal Pipe Line By Drc Pipes And Bends Below Culvert In Residential Area Sangrampur Village Etc. Outside Plant Under Ahp-mm, Bktpp Under Capex 2025-26