Rotation And Replacement With Painting Of Ash Disposal Line, Ba, Silo Slurry And Baotp Line Of Unit-6 During Upcoming Oh Under Ahp-Mm, Stps.
Installation Of Program For Monitoring Of System For Ash Disposal Line Erosion Patterns Of Ahp-iv At Stps Sarni.
Rate Contract For Dp Changes Of Ash Slurry Disposal Line At Ash Pond-I And Ii Under Ahp-Mm, Bktps
Work Contract For Replacement Of Ash Slurry Disposal Line Of Size 300 Nb Ms Erw Pipe For Ash Handling System In 1x210 Mw Atps, Mppgcl, Chachai.
Gem Bids For Custom Bid For Services - 200147103 Shifting Andextention Of Garlanding Ash Disposal Line Atshahpur Dyke And Idea Tower In Stage Ntpcsingrauli /
Dismantling, Fabrication And Erection Of Damaged 300mm M.s. Ash Disposal Line No:i And Ii From Sleeve Joint No:92 To 124 With New Ms Pipe And Ash Disposal Line-iii 180 Degrees Rotation From Sleeve Joint No:92 To 124 Of Stage-iii Inside The Tunnel And Clearing And Cleaning Of Accumulated Ash In The Closed Tunnel For The Year 2025-26
Ttps Mech Ii Bm Unit I Strengthening Of Weak Welding Joints Of Step Grills Platform Grills Renewal Of Damaged Corroded Structurals From 0 Mtr To 52 Mtr Elevation And Re Routing Of Ash Disposal Pipe Line Of Unit I Boiler
Cleaning The Choked Up Ash In 300nb Dia Mserw Ash Slurry Disposal Pipe Line -1, 2 And 3 From Ash Slurry Disposal Pump House To Nap I And Ab Ash Pond As And When Required During The Year 2025 26
Rotation And Replacement Of 200nb And 300 Nb Ci And Ms Pipe Line Of Esp Hopper And Bottom Discharge Line, Vacuum Line, Ash Slurry Disposal Line During Overhauling Of Unit 3, 2 And 210 Mw, Btps
Ktps-vii Stage-oandm-cam-dismantling Of 300nb Mserw Ash Slurry Disposal Pipe Line Of Ktps-vii Stage I.e., Line-3 From Ab Ash Pond Diverted Point To Northern Ash Pond-i Up To Nap-ii Diversion Point In The Year 2025-26