Supply Of High Carbon High Chrome Ball Transfer Unit Btu.
Supply Of Heavy Load Capacity Solid Ball Transfer Unit..
Supply of Spares For Psp Coupling, 69 Omni Track Ball Transfer Unit Shear Pin Cartridge Complete Assembly Without Shear Pins Upper Plate For Vertical Support Assembly Counter Sunk Screw For Shear Pin Cartridge Assembly Cap Screw For Ball Transfer Unit Assembly M30 X 70Mm Din912 Gr.12.9 Cap Screw For Coupling Assembly M30 X 80Mm Din912 Gr.12.9 Cap Screw For Coupling Assembly
Supply of Complete Ball Transfer Unit Btu & Recessed D-Ring Assembly And Their Fitment On Floor Plate For Nmghs Coaches.. 1.Supply Of Commercially Available Complete Ball Transfer Unit Btu And Recessed D-Ring Assembly With Suitable Multi Grip Pop Up Rivet & 2 Fitment Of Ball Transfer Unit And D-Ring On Floor Plate Of Nmghs Coaches Details Given In Enclosed Annexure-1 . Warranty Period: 12 Months After The Date Of Delivery
Supply of Set Of Ball Transfer Unit And Stainless Steel Multigrip Rivet As Per Annexure. Sample Suitability Should Be Obtained From Consignee Before Bulk Supply. Warranty Period: 30 Months After The Date Of Delivery
Supply Of Flange Mounted Ball Transfer Unit Broadly Confirming To Crws Drg. No Swr-Ubls- C&W-343, With Suitable Stainless Steel Pop Up Rivets To Fix In The 6Mm Thick Ferrous Plate. Spec 1 Ball Diameter- 25.4 Mm 1 Inch 2 Minimum Load Bearing Capacity-50 Kg. Material As Per Crws Drg. No Swr-Ubls-C&W- 343 Note: Sample/Prototype Has To Be Submitted For Approval Of Consignee Before Bulk Supply. Warranty Period: 12 Months After The Date Of Delivery
Supply of Ball Transfer Unit As Per Drawing No: Icf/M&P/2125. Warranty Period: 30 Months After The Date Of Delivery