Mtps I Mill Plant Unit Ii Overhauling Of Gravimetric Feeders And Clean Out Conveyor And Cleaning Clearing The Coal Dust And Ash Deposited From Bunker Platforms Feeder Floor Feeder Discharge Chute Platforms Coal Pipes Mill Floor And Mill Gearbox
Gem Bids For Operation And Maintenance Of Other Machines And Plants -cleaning Of Coal Dust, Coal Slurry And Spilled Out Coal Fromall The Conveyors And Clearing Of Entire Plant Including Drivehouses, Transfer House, Walkways/ Catways, Jammedtransfer Chutes, Tr.
Removal Of Spilled Over Coal And Fine Dust At Stacker Cum Reclaimer-1 And 2 And Along And Underneath Of Bcn-8 And 9 Conveyor By Head Loads On To Running Conveyor From 01.12.2025 Or Actual Date Of Commencement To 31.03.2026 Required In Mm-iv Sub Division Of Mm/chp/btps.
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Bcn-3ab Tunnel, Fg Floor At Tp-2, Ground Portal, Gallery And Head End Areas And Contingency-1 And 2 Area Of 3ab Including Fg Floors And Reclaim Belt Conveyors And Reclaim Chain Feeders By Head Loads On To Running Conveyor Required In Mm/chp/btps From 01.12.2025 Or Actual Date Of Commencement Of Work To 31.03.2026.
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Head End Area Of Bcn-1ab At Tp-1 Including Fg Floor, Gallery Area, Mh-2, Module-1 To 10 And Tail End Area At Mh-1 Including Hgtu By Head Loads On To Running Conveyor Required In Mm/chp/btps From 01.12.2025 Or Actual Date Of Commencement Of Work
Removal Of Spilled Over Coal Fine Dust And Wet Coal At Tail End, Head End, Along The Bcn 4a/b, 5a/b, Bcn-10, Tp-3, Tp-4, 6a/b Tail End And Erh Area By Head Loads On To Running Conveyor From 01.12.2025 Or Actual Date Of Utilization To 31.03.2026 Required In Mm-iii Sub Division Of Mm/chp/btps.
Removal Of Spilled Over Coal And Fine Dust At Crusher House Floors By Head Loads On To Running Conveyor Required In Mm/chp/btps From 01.12.2025 Or Actual Date Of Commencement Of Work To 31.03.2026
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Tail End Head End Along The Bcn-7a/b, 6a/b Head End, Gallery, Bunkers Floor And Tp-5 Area By Head Loads On To Running Conveyor From 01.12.2025 Or Actual Date Of Commencement Of Work To 31.03.2026.
Removal Of Spilled Over Coal, Fine Dust And Wet Coal At Apron Feeder Floor And Bcn-2ab Tunnel Including Fg Floors By Head Loads On To Running Conveyor From 01.12.2025 Or Actual Date Of Commencement Of Work To 31.03.2026 Required In Mm-i Sub Division Of Mm/chp/btps.
Gem Bids For Custom Bid For Services - Spraying Water Through Mobiletanker For Dust Suppression On Coal Transportation Roadfrom Ballarpur Open Cast Mine Stock Yard To Ballarpur Opencast Mine Railway Siding Under Ballarpur Sub Area /