"नये भारत का नया Tender Portal"
Request a call back

Latest Tenders for cr panel

Total 85 tenders found
#TBR: 36252411 Live

Power Plant

  • Gujarat
  • Due On: 20 Jan, 2026 (8 Days Left)

Work Of Augmentation Of New Proposed Tr No 4, 220/66Kv Including Erection Of Bay Equipment, Cr Panel, Control Wiring Etc. At 220Kv Radhanpur S/S Under Deodar Division Of Palanpur Circle Approved Under R & M 25-26

18.17 Lacs
View Tender
#TBR: 36239875 Live

Power Plant

  • Kerala
  • Due On: 12 Jan, 2026 (0 Days Left)

Erection Of Grider Power Equipment Including Structure Of 33Kv Bus Isolator Cb Ct La Pt Bus Coupler Isolator Earthing Of This Equipment Using Gi Strip And Providing Riser And Auxiliary Mat Using 25Mm Ms Rod Cr Panel Erection Con Capacity Enhancement Of 33Kv Substation Muthalamada By Installing Additional 5Mva 33/11Kv Transformer-Equipment Erection, Earthing And Control Cable Work

6.91 Lacs
View Tender
#TBR: 36233014 Closed

Railway Transport

  • Maharashtra
  • Due On: 06 Jan, 2026 (0 Days Left)

Supply Of Air Brake Equipment-supply Of These Three Items Consisting In One Set 1 Pressure Gauge Pressure Capacity 10kg\cm2 For Measuring Bp, Fp, Bc & Cr Pressure In Dv Panel Of Lhb Coaches. Qty -2 No. 2 Thermoplastic Tube With Both End Connectors For Pressure Testing In Ftil Make Dv Panel Pressure Capacity 10kg\cm2. Qty -1 No. 3 Coupling Pressure Testing Connector Brass Material In Kbi And Escorts Make Dv Panel. Pressure Capacity 10kg\cm2. -1 No. Note - Gauge Should Be Calibrated With Calibration Certificate And Pressure Gauge Filled With Glycerin..

Ref. Document
View Tender
#TBR: 36208370 Live

Power Plant

  • West Bengal
  • Due On: 15 Jan, 2026 (3 Days Left)

Schedule Of Labour For Electrical Wiring With Installation Of Distribution Lights Fans Power Points 11 Kv Vcb Panel 33 Kc Cr Panel With Allied Works At Tarui 33 11 Kv Sub Stn At Tarui Under Arambagh Division Wbsedcl Rm/Hg/Elect/Tender/2025-26/31

4.41 Lacs
View Tender
#TBR: 36130408 Closed

Power Plant

  • Gujarat
  • Due On: 06 Jan, 2026 (0 Days Left)

Tender For Work Of Erection Of Bay Equipment, Cr Panel, Control Wiring, Earthing Etc At 66kv Varahi Sub-station Under Deodar Division

7.59 Lacs
View Tender
#TBR: 36132768 Closed

Power Plant

  • Gujarat
  • Due On: 30 Dec, 2025 (0 Days Left)

Work Of Augmentation Of New Proposed Tr No 4, 220/66kv Including Erection Of Bay Equipment, Cr Panel, Control Wiring Etc. At 220kv Radhanpur S/s Under Deodar Division

18.17 Lacs
View Tender
#TBR: 36081386 Closed

Railway Transport

  • Telangana
  • Due On: 18 Dec, 2025 (0 Days Left)

Supply Of Ni-cr Test 3 Types Of Panel As 1)ni-cr Panel Sizes- 20 Micron, Crack Depth 20 Micron And Width 1.0 Micron Approx.2) Ni-cr Panel Sizes- 30 Micron, Crack Depth 30 Micron And Width 1.5 Micron Approx.3) Ni-cr Panel Sizes- 50micron, Crack Depth 50 Micron And Width 2.0 Micron Approx. 01 Pair Per Set Each For Sensitivity Check Of Dye Penetrant/fluorescent Dye Penetrant Test With Manufacturer Certificates And Reference Crack Detection Photograph.

Ref. Document
View Tender
#TBR: 36036551 Closed

Electrical Products

  • Uttar Pradesh
  • Due On: 17 Dec, 2025 (0 Days Left)

Gem Bids For Group-1 Total Lump Sum Price Of Smaw Equipment-04 Nos (02 Nos. In Talcher Project And 02 Nos. In Lara Project) And Gtaw Equipment -04 Nos (02 Nos. In Talcher Project And 02 Nos. In Lara Project) Along With All Accessories Including Freight And Gst Group-1- Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Of Tender Group-1- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-2-total Lump Sum Price For Videoscope/borescope For Boiler Tube,header Inspection And Retrieval Tool-02 Nos. (01 In Talcher And 01 In Lara Project) And Video Image Scope With Measuring Facility-02 Nos. And Magnifying Glass-08 Nos. Along With All Accessories-08 Nos. (04 In Talcher And 04 In Lara Project) Please Refer Price Schedule Group-2 -total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Of Tender. Group-2 - Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-3-total Lump Sum Price For Portable X-ray Residual Stress System-02 Nos (01 Nos. In Talcher Project And 01 Nos. In Lara Project) Along With All Accessories-please Refer Price Schedule Group-3 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection And Commissioning Etc. At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule. Group-3 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 010 Visit In Lara Group-4-total Lump Sum Price For Abi (automated Ball Indentation) Tester For Mechnical Propoerties-02 Nos (01 Nos. In Talcher & 01 Nos. In Lara Project) Along With All Accessories-please Refer Price Schedule Group-4 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Group-4 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-5 - Total Lump Sum Price For Magnetic Particle Inspection Yoke Type-02 Nos (01 In Talcher And 01 In Lara), Pie Gauge For Mpi-02 Nos (01 In Talcher And 01 In Lara), Radiography Film Densitometer-02 Nos (01 In Talcher And 01 In Lara) , Uv Lamp For Fluorescent Mpi And Dpt-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories-please Refer Price Schedule Group-5 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule N Group-5 - Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara-please Refer Price Schedule Group-6 -total Lump Sum Price Radiation Survey Meter-02 Nos (01 In Talcher And 01 In Lara), Personal Digital Dosimeter-04 Nos (02 In Talcher And 02 In Lara), Ultrasonic Testing Machine-conventional With Probes And Calibration Blocks-02 Nos (01 In Talcher And 01 In Lara) With All Accessories Group-6- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-6 - Total Lump Sum Price For Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-7-total Lump Sum Price Digital Radiography-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-7- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara. Please Refer Price Schedule Group-7 - Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara.please Refer Price Schedule. Group-8- Total Lump Sum Price For Optical Microscope For Replica Interpretation,optical Microscope And Image Analysis System, Stereo Microscope With Camera Attachment-02 Nos(01 In Talcher And 01 In Lara) Alongwith All Accessories Along With All Accessories Group-8- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-01 Days In Talcher And 01 Days In Lara Group-8- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-9- Total Lump Sum Price-computed Radiography-cr-scanner-02 Nos-(01 In Talcher And 01 In Lara) Alongwith All Accessories Please Refer Price Schedule Group-9- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-9- Total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-10-total Lump Sum Price-hardness Tester -rebound Type-02 Nos (01 In Talcher And 01 In Lara) And Hardness Tester_uci Method-02 Nos-(01 In Talcher And 01 In Lara)along With All Accessories Group-10- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-10- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-11-total Lump Sum Price For Radiography Film Viewer-04 Nos (02 In Talcher And 02 In Lara), Radiography Film Samples-asme-02 Nos (01 In Talcher And 01 In Lara) , Magnetic Particles Inspection-coil Type With Cable-02 Nos (01 In Talcher And 01 In Lara), Gaussmeter For Mpi-02 Nos (01 In Talcher And 01 In Lara) , Ni-cr Panel For Dpt-02 Nos (01 In Talcher And 01 In Lara). Please Refer Price Schedule Group-11- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-11- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-12-total Lump Sum Price For Hardness Tester-02 Nos (01 In Talcher And 01 In Lara), Exfoliation Meter For Ss Tubes-02 Nos (01 In Talcher And 01 In Lara), Thermography Camera-02 Nos (01 In Talcher And 01 In Lara), Holiday Detector-02 Nos (01 In Talcher And 01 In Lara), Engineering Stethoscope-02 Nos (01 In Talcher And 01 In Lara), Portable Vibration Meter-02 Nos (01 In Talcher And 01 In Lara), Comparator-02 Nos (01 In Talcher And 01 In Lara), Surface Roughness Meter-02 Nos (01 In Talcher And 01 In Lara), Spirit Level-04 Nos (02 In Talcher And 02 In Lara), Noise Level Meter-02 Nos(01 In Talcher And 01 In Lara), Torgue Wrench-02 Set (01 In Talcher And 01 In Lara), Pressure Gauge-04 Nos (02 In Talcher And 02 In Lara), Mercury Thermometer-04 Nos (02 In Talcher And 02 In Lara), Infrared Thermometer-02 Nos (01 In Talcher And 01 In Lara), Digital Thermometer _n-contact_-02 Nos(01 In Talcher And 01 In Lara), Digital Thermometer Contact-type-02 Nos(01 In Talcher And 01 In Lara),thermocouple Test-4 Nos(02 In Talcher And 02 In Lara), Barometer -aneroid-08 Nos(04 In Talcher And 04 In Lara), Mameter-test And U Tube-02 Nos (01 In Talcher And 01 In Lara),hygrometer-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-12-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-10 Days In Talcher And 10 Days In Lara Group-12-total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-13-total Lump Sum Price For Replica Kit For In-situ Metallography-02 Nos (01 In Talcher And 01 In Lara), Sample Preparation Tools_machines-02 Set(01 In Talcher And 01 In Lara), In-situ Metallogrpahy Kit-grinder And Polisher With Accessories-02 Set(01 In Talcher And 01 In Lara) Along With All Accessories Group-13- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-06 Days In Talcher And 06 Days In Lara Group-13- Total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-14-total Lump Sum Price For Mcf_magnetic Stauroscope_for Assessment Of Quality Of Pwht-02 Nos, Argon Purity Tester-02 Nos(01 In Talcher And 01 In Lara), Inspector Kit For Welding Inspection-02 Nos(01 In Talcher And 01 In Lara),temperature Gun-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-14- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-14- Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-02 Visit In Talcher And 02 Visit In Lara Group-15-total Lump Sum Price For Binoculars-04 Nos(02 In Talcher And 02 In Lara), Laser Alignment Kit With Target Kit-02 Nos(01 In Talcher And 01 In Lara), Along With All Accessories Group-15-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-15- Total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-16-total Lump Sum Price For Remote Field Eddy Current Testing_advance Electro Magnetic Testing-02 Nos (01 In Talcher And 01 In Lara), Along With All Accessories Group-16-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-16-total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-17-total Lump Sum Price For Helium Leak Detector-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-17-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-17- Site Visit - - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-18-total Lump Sum Price For Oxide Measurement For Boiler Tubes-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-18-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-18-total Lump Sum Price For Site Visit - Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-19-total Lump Sum Price For Ultrasonic Thickness Meter_d-meter-digital-04 Nos (02 In Talcher And 02 In Lara), Vernier 300 Mm Scale-04 Nos (02 In Talcher And 02 In Lara),vernier 600 Mm Scale-04 Nos (02 In Talcher And 02 In Lara), Outside Micrometre-04 Nos (02 In Talcher And 02 In Lara), Inside Micrometer 25-750_dial-04 Nos (02 In Talcher And 02 In Lara), Measuring Tape-04 Nos (02 In Talcher And 02 In Lara), Paint Thickness Meter_elcometer-ultrasonic Digital-02 Nos (01 In Talcher And 01 In Lara), Paint Adhesion Testing Kit-02 Nos(01 In Talcher And 01 In Lara),internal Oxide Scale Measuring System With Probe_utbased-02 Nos(01 In Talcher And 01 In Lara) Along With All Accessories Group-19- Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-04 Days In Talcher And 04 Days In Lara Group-19-total Lump Sum Price For Site Visit- Should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara Group-20-total Lump Sum Price For Welding Simulator-02 Nos (01 In Talcher And 01 In Lara) Along With All Accessories Group-20-total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc For Supervision Of Erection And Commissioning Etc At Site-02 Days In Talcher And 02 Days In Lara Group-20-total Lump Sum Price For Site Visit -should Include Travel Expenses To-fro Site, Visa- Insurance-if Applicable, Intermediary Stay- For Sup Of E And C Etc At Site-01 Visit In Talcher And 01 Visit In Lara

Ref. Document
View Tender
#TBR: 36016732 Closed

Power

  • Punjab
  • Due On: 15 Dec, 2025 (0 Days Left)

Te 367 Transformer Cr Panel Under Rdss Te 367 Cr Panel

Ref. Document
View Tender
#TBR: 35769693 Closed

Power Plant

  • West Bengal
  • Due On: 18 Nov, 2025 (0 Days Left)

Renovation Of 33 Kv Od Type Metering Switchgear Along With Cr Panel And Accessories Electrical Work At The Premises Of M/s Balaji Paper And Newsprint Pvt Ltd Consumer Ld 950087301 At Manikpara, Jhargram Under Jhargram Division Renovation Of 33 Kv Od Type Metering Switchgear Along With Cr Panel And Accessories Electrical Work

Ref. Document
View Tender
Download Document