Etender For Hiring Onr 1 No Of Insulated Covered Vehicles For Maldah B Route Having 750 Nos Crates 8.6 Ton Load/goods Carrying Capacities
Construction Of Retaining Wall In Wire Crate Restoration Of Damages On Bag Sarohali Road
Construction of Pcc Toe Wall And Wire Crate R/wall At Rd 2/085 To 2/100 R/o R/d On Dabbi Shathla Road Km 0/000 To 3/000
Construction Of Crate Wire Bunds Using Black Annealed Wire Crate Mesh To Check Soil Erosion Step Wise Crates Near Patandopan Closure Hwls
Restoration Of Washed Away Right Side Crate Work Of Supply Channel Of Sofi Khul At Offtake Point
Construction Of Crate Revetment With Earthen Bund From Rd 23600-24000m Near Village Bakore On Right Bank Of River Chenab And Improvement/ Extension Of Three Nos Crate Stud Between Rd 24350-25150m Near Village Dhanpur Datyal On Right Bank Of River Che Construction Of Protection Works On Critical Spots Downstream Steel Bridge Akhnoor To Hamirpur On Both Banks Of River Chenab
Construction Of Crate Revetment To Protect Pump Room Building Of Lis Jogwan
Construction Of Crate Revetment And Embankment Between Rd 15600-15780m Near N. S. Pura, Restructuring/ Strengthening Of Crate Revetment Between Rd 15900-16000m, Channelization Of Creek For Diversion Of Water In Front Of Rd 16050-16400m And Raising/ R Construction Of Protection Works On Critical Spots Downstream Steel Bridge Akhnoor To Hamirpur On Both Banks Of River Chenab
Construction Of Crate Revetment With Earthen Bund From Rd 23100-23600m On Right Bank Of River Chenab Near Village Bakore On Right Bank Of River Chenab Under Nabard Construction Of Protection Works On Critical Spots Downstream Steel Bridge Akhnoor To Hamirpur On Both Banks Of River Chenab
Construction Of Crate Revetment Between Rd 13780-15000m On Right Bank Of River Chenab At C.k. Pura/ Muthi Maira. Under Nabard Construction Of Protection Works On Critical Spots Downstream Steel Bridge Akhnoor To Hamirpur On Both Banks Of River Chenab